The kikonge power station is a proposed hydroelectric scheme on the Ruhuhu River in south-western Tanzania, not a plant that generates electricity today. The idea is to build a large dam at Kikonge, close to where the river enters Lake Nyasa, and use it for power, irrigation and flood control.
The scheme is listed as a TANESCO project. In August 2016 the African Water Facility, which is managed by the African Development Bank, awarded a grant towards a pre-feasibility study. The study was expected to take about 22 months.
Published sources differ on whether the site belongs under Ruvuma Region or Ludewa District in Njombe Region. The old version of this article described Kikonge as an operating station, with invented output figures and community stories. Those claims have been removed.
What the Kikonge hydropower project would involve
According to the Wikipedia article on the Kikonge scheme, the plan is for a 300 MW station with a reservoir holding about six billion cubic metres of water. Industry profiles mention three turbines of 100 MW each, but these are design figures from the study stage, not measured output.
The 2016 study announcement argued that a large storage dam could give steadier year-round supply than run-of-river plants, which struggle in dry years. That concern was real: in October 2015 low water levels forced hydro plants holding about a third of national capacity offline.

The Ruhuhu River and the Lake Nyasa shore
The Ruhuhu River rises on the eastern slopes of the Livingstone Mountains, flows south-east and then turns west to Lake Nyasa, which it joins just south of Manda. It is over 300 km long and is the longest river feeding the lake. The proposed dam site is at the Kikonge gauge, about 20 km upstream of the mouth.
Manda is reached from Ludewa by the T31 road from Nundu to Manda. Any reservoir of this size would need full environmental and resettlement studies, and the 2016 announcement specifically mentioned protecting the ecology of the Lake Nyasa shoreline.

Where the Kikonge dam plan stands today
Older project profiles gave 2025 as a target year, but as of October 2026 we found no reliable report of construction starting, a contractor being appointed or construction finance being signed.
For now, Tanzania’s big hydro capacity comes from existing plants and the 2,115 MW Julius Nyerere station on the Rufiji River, whose nine turbines were all reported operational in April 2025. Our overview of where Tanzania’s electricity comes from gives the wider picture, and TANESCO and the Ministry of Energy are the places to watch for news on Kikonge.