Tanzania Electric Train Speed: How Fast the SGR Runs and Journey Times

The Tanzania electric train speed people ask about refers to the Standard Gauge Railway (SGR), the country’s new electrified line. Passenger trains on the SGR are designed to run at up to 160 km/h (about 100 mph), far faster than the old metre-gauge railway and quicker than most road journeys on the same route.

Tanzania Electric Train Speed: Design vs Everyday Running

The 160 km/h figure is the design speed for passenger services; freight trains run more slowly. Actual average speeds are lower because trains slow down near stations, on curves and through towns, and because of stops along the way. Express services that skip smaller stations are fastest.

The line is operated by the Tanzania Railways Corporation (TRC), with electric multiple units and electric locomotives drawing power from overhead lines. More detail is on the Tanzania Standard Gauge Railway page.

Journey Times on the SGR

Passenger services began between Dar es Salaam and Morogoro in June 2024 and were extended to Dodoma later that year. Dar es Salaam to Morogoro takes under two hours by train, compared with three to four hours or more by road in heavy traffic. Dar es Salaam to Dodoma takes roughly three and a half to four and a half hours, depending on the service.

Timetables and fares are set by TRC and change from time to time – our guide to booking SGR tickets online explains how to buy a seat.

Man sitting by the window inside a modern metro train carriage
A passenger seated in a modern train carriage – SGR trips from Dar es Salaam to Morogoro take under two hours.

How the Tanzania Electric Train Speed Compares

The old metre-gauge Central Line, built in the colonial era, typically runs much more slowly, and the Dar es Salaam–Zambia TAZARA line is known for long journey times. The SGR’s speed comes from its wider standard gauge, modern track, gentle curves and electric traction. Read about the older line and Chinese-built TAZARA in our article on Tanzania’s railways and China.

Compared with buses, the train avoids road congestion and checkpoints, which makes journey times more predictable.

Yellow diesel locomotive pulling a train past tall city buildings
A diesel locomotive pulling a train past city buildings – older diesel-hauled lines are much slower than the electric SGR.

Building Further

Further sections towards Tabora, Mwanza and Kigoma are under construction or planned, which would extend high-speed electric rail to the Lake Victoria and Lake Tanganyika regions. Turkish contractor Yapı Merkezi built early sections – see our page on Yapı Merkezi and the SGR – and our overview of the Tanzania electric train covers the project in more depth.

For more articles related to Trains in Tanzania click here

Recommended Articles From Around the Web