Julius Kambarage Nyerere
Julius Kambarage Nyerere

Project Name:   School Construction Equipment Project

Project Status:  Closed

Description:       The School Construction and Equipment Project for Tanganyika will assist in the construction of two new boarding schools and extensions to 53 other schools in Tanganyika. The project will finance part of the capital cost of an expansion of the secondary school system from 1962 to 1967 with the object of increasing the secondary school enrollment from the present figure of about 15,600 to 22,500, and of increasing the number of pupils who complete the whole four-year secondary course from about 2,000 to about 5,500. It will provide more secondary school graduates to train for the wide range of jobs necessary to the economic and social development this Tanganyika. This project is regarded as an economic development and an engine to drive the country toward economic development.

Approval Date: 1963-12-19T00:00:00Z

Closing Date:     1967-12-31T00:00:00Z

Total Project Amount:   $4,600,000.00

Borrower: NA   

Implementing Agency:  NA         

 

 

Project Name:   Highway Project (01)

Project Status:  Closed

Description:       The Highway Project for Tanganyika will assist in the cost of improving the roads to standards, suitable for growing traffic. The project consists of the design, improvement, construction, and reconstruction of eight roads totaling 734 miles in length. Six of the roads in the project already exist as part of the main road system while the remaining two are existing district roads, which will eventually be incorporated into the main system. It will provide safe and quicker transport of passengers; a stimulus to the development of transport and ancillary industries; and administrative, social, and commercial advantages will result from quicker and assured transport connections. Economic benefits will increase with the growth of traffic thereafter.

Approval Date: 1964-02-05T00:00:00Z

Closing Date:     1969-06-30T00:00:00Z

Total Project Amount:   $14,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   EAST AFRICAN HARBORS II

Project Status:  Closed

Description:      

Approval Date: 1965-09-29T00:00:00Z

Closing Date:     1971-06-30T00:00:00Z

Total Project Amount:   $-  

Borrower:          

Implementing Agency: 

 

Project Name:   EAST AFRICAN RAILWAYS II

Project Status:  Closed

Description:      

Approval Date: 1965-09-29T00:00:00Z

Closing Date:     1971-06-30T00:00:00Z

Total Project Amount:   $100,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Agriculture Project

Project Status:  Closed

Description:       The proposed credit will help finance a part of the National Development Credit Agency’s program to provide to cooperatives and, through cooperatives, to farmers: (a) short-term credit to finance fertilizers and pesticides for cotton and coffee; (b) medium-term credit to finance farming, dairying and fishing equipment; and (c) long-term credit to finance the development of tea and sisal smallholdings and primary agricultural processing facilities.

Approval Date: 1966-01-13T00:00:00Z

Closing Date:     1971-06-30T00:00:00Z

Total Project Amount:   $5,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   EACSA COMMUNICATIONS

Project Status:   Closed

Description:       

Approval Date:  1967-02-17T00:00:00Z

Closing Date:      1973-09-30T00:00:00Z

Total Project Amount:   $-  

Borrower:          

Implementing Agency: 

 

Project Name:   EACSA COMMUNICATIONS

Project Status:   Closed

Description:       

Approval Date:  1967-02-17T00:00:00Z

Closing Date:     

Total Project Amount:   $100,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Power Project

Project Status:   Closed

Description:        The proposed project forms part of an interim expansion program during the years 1968 through 1970 which will provide TANESCO with additional facilities to help meet the demand for power until the next major generating station can be commissioned. The project provides some 21 megawatts of diesel generating plant in Dar es Salaam and Mwanza, minor extensions to generating plant in isolated areas, and related extensions to transmission lines and distribution networks. There is no alternative method of meeting the load growth more economically until a major hydroelectric installation can be commissioned.

Approval Date:  1967-11-13T00:00:00Z

Closing Date:      1972-06-30T00:00:00Z

Total Project Amount:   $5,200,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Highway Project (02)

Project Status:   Closed

Description:        The original project, for which the existing highway credit (No. 48-TA) was made, consisted of the detailed engineering and construction of eight major roads, totalling 734 miles. The proposed revised project, which both the existing credit and this proposed supplementary credit would help to finance, consists of: (1) the detailed engineering and construction of six of the original eight roads, totalling 533 miles; (2) the detailed engineering of a 142 mile section of the main road to the Zambia border from Dar es Salaam; (3) the detailed engineering of feeder roads totalling about 210 miles in the Geita Peninsula area; and (4) a staffing and training program in the Roads and Aerodromes Division of the Ministry of Communications, Labour and Works.

Approval Date:  1968-03-21T00:00:00Z

Closing Date:      1973-06-30T00:00:00Z

Total Project Amount:   $3,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Livestock Project (01)

Project Status:   Closed

Description:        The proposed credit would help finance the development by the National Agricultural Co. Ltd. of five ranches; the provision of technical services and the training of ranch managers.

Approval Date:  1968-10-22T00:00:00Z

Closing Date:      1973-12-31T00:00:00Z

Total Project Amount:   $1,300,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Tan-Zam Highway Project (02)

Project Status:   Closed

Description:        The proposed project consists of (i) the realignment and reconstruction to two-lane asphalt paved standard of the existing earth/gravel sections of the Ten-Zam Highway from a point 38 miles west of Morogoro to Mahenge (a length of 102 miles) including the Ruaha River bridge at Mauyuni, and from Iringa to Iyayi (a length of 125 miles); (ii) the reconstruction to two-lane asphalt paved standard of the existing paved but low standard sections of the Tan-Zam Highway from Morogoro to a point 38 miles to the west and from Mahenge to Iringa (a length of 45 miles); and (iii) consultant’s services for engineering supervision of the above works. Concurrently USAID is financing reconstruction of the highway from Iyayi to Tunduma (145 miles) on the Zambia border. Reconstruction of the Zambia section of the highway from Tunduma to Kapiri Mposhi is being financed by the Government of Zambia, the United Kingdom and two loans from the Bank.

Approval Date:  1969-02-18T00:00:00Z

Closing Date:      1978-12-31T00:00:00Z

Total Project Amount:   $15,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Education Project (02)

Project Status:   Closed

Description:        The proposed project consists of (i) the construction and equipment of one new secondary school, (ii) extensions to 24 secondary schools, (iii) extensions to two primary teacher training colleges, (iv) extensions to one secondary teacher training college, (v) construction of 63 staff houses at 14 secondary school schools and 2 primary teacher training colleges, (vi) remodeling of 9 staff houses at 2 secondary schools, and (vii) consulting services for the above works.

Approval Date:  1969-04-29T00:00:00Z

Closing Date:      1976-12-31T00:00:00Z

Total Project Amount:   $5,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   EAST AFRICAN HARBORS CORP.

Project Status:   Closed

Description:       

Approval Date:  1969-07-29T00:00:00Z

Closing Date:      1977-12-31T00:00:00Z

Total Project Amount:   $100,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   TANZAM SUPPL HIGHWAY

Project Status:   Closed

Description:       

Approval Date:  1969-11-13T00:00:00Z

Closing Date:     

Total Project Amount:   $7,500,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   EAC – RAILWAYS III

Project Status:   Closed

Description:       

Approval Date:  1970-03-24T00:00:00Z

Closing Date:      1978-06-30T00:00:00Z

Total Project Amount:   $-  

Borrower:          

Implementing Agency: 

 

Project Name:   RAILWAYS III

Project Status:   Closed

Description:       

Approval Date:  1970-03-24T00:00:00Z

Closing Date:     

Total Project Amount:   $100,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   EAC POST & TELECOM II

Project Status:   Closed

Description:       

Approval Date:  1970-05-19T00:00:00Z

Closing Date:      1975-12-31T00:00:00Z

Total Project Amount:   $-  

Borrower:          

Implementing Agency: 

 

Project Name:   POST & TELECOM II

Project Status:   Closed

Description:       

Approval Date:  1970-05-19T00:00:00Z

Closing Date:     

Total Project Amount:   $100,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Flue Cured Tobacco Project

Project Status:   Closed

Description:        The main components of the project are: (a) the establishment of some 15,000 new growers in 150 new village communities, arranged in complexes of about ten villages each, cultivating at full development 30,000 acres of tobacco; (b) the construction of village and on-farm infrastructure comprising access roads, village water supplies, baling centers, curing barns and grading sheds; (c) the establishment of some 15 cooperative societies, of about 1,000 farmers each, to act as channels for the distribution of farm credit and other inputs and to supervise baling; (d) the provision of credit for on-farm seasonal inputs and infrastructure and for working capital for the cooperatives; (e) the provision of staff for project planning and management, for extension services for farmers and cooperatives, for training and research and for NDCA and the Tanganyika Tobacco Board, together with necessary facilities; (f) the introduction of a system of tobacco auctions and construction of an auction floor and additional tobacco storage and processing facilities, following a study of these proposed new marketing arrangements.

Approval Date:  1970-10-06T00:00:00Z

Closing Date:      1977-12-30T00:00:00Z

Total Project Amount:   $9,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Kidatu Power and Supplementary Loan Project

Project Status:   Closed

Description:        The main items in the project are: (a) construction of the first stage of a hydroelectric power complex at Kidatu on the Great Ruaha River, including a dam creating a reservoir and an under-ground generating station with a capacity of 100 MW and with provision for the addition of two more 50 MW units when required; (b) extension by about 15 MW of an existing diesel generating station at Ubungo, near Dar es Salaam, to provide additional power needed before the commissioning of the Kidatu Project; (c) construction of a single circuit 220 KV transmission line from Kidatu to Ubungo and related step-down substation at Ubungo; and (d) consulting services required for implementing the project and to study and make recommendations for dealing with the ecological effects of the project and subsequent stages of development.

Approval Date:  1970-12-08T00:00:00Z

Closing Date:      1976-12-31T00:00:00Z

Total Project Amount:   $30,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Education Project (03)

Project Status:   Closed

Description:        The proposed project consists of a program to expand facilities for agricultural training in Tanzania at intermediate and farmer levels. A substantial technical assistance component is included in the project to ensure the effective utilization of the new facilities. The main components of the project are: (a) the construction and equipping of two new, and additions to two existing, certificate/diploma level agricultural institutes; (b) the construction and equipping of four new Rural Training Centers (RTCs) and the conversion of five existing District Training Centers into RTCs; and (c) the provision of 14 man/years of specialists’ services and 7 man/years of counterpart fellowships, principally for the development of training programs at the Agricultural Training Institutes and RTCs.

Approval Date:  1971-02-02T00:00:00Z

Closing Date:      1977-12-31T00:00:00Z

Total Project Amount:   $3,300,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Highway Project (03)

Project Status:   Closed

Description:        The project comprises: (a) the paving of a 200 km section of the main Southern Trunk Road between Mtwara and Masasi, part of which was improved to gravel standard under the First Highway Project; (b) betterment of 475 km of agricultural feeder roads in the Geita district and Mara region in Northern Tanzania through the creation of departmental units and the provision of staff and equipment for them; (c) technical assistance to direct and supervise the above works, train local staff required for the betterment units to be established under (b), and continue the staffing and training program in COMWORKS initiated under the First Highway Project; and (d) engineering and other studies for the preparation of the present project and a further 250 km of roads which seem likely candidates for inclusion in future highway projects in Tanzania.

Approval Date:  1971-07-27T00:00:00Z

Closing Date:      1978-12-31T00:00:00Z

Total Project Amount:   $6,500,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Tea Project

Project Status:   Closed

Description:        The planting of 8,300 hectares of tea by about 14,000 smallholders in four areas in Tanzania over 3 years; the construction of all-weather tea roads; the construction, expansion and equipping of five tea factories; the provision of extension, housing and leaf collection services; and the establishment of tea nurseries for production of planting material.

Approval Date:  1972-02-28T00:00:00Z

Closing Date:      1980-12-31T00:00:00Z

Total Project Amount:   $10,800,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   EAST AFRICAN RAILWAYS III

Project Status:   Closed

Description:       

Approval Date:  1972-11-21T00:00:00Z

Closing Date:      1978-06-30T00:00:00Z

Total Project Amount:   $-  

Borrower:          

Implementing Agency: 

 

Project Name:   E AFRICAN HARBORS II

Project Status:   Closed

Description:       

Approval Date:  1972-11-21T00:00:00Z

Closing Date:     

Total Project Amount:   $100,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Education Project (04)

Project Status:   Closed

Description:        The Fourth Education Project will assist the Government to implement its education development program by the following: (1) the construction, furnishing and equipping of: (a) three general secondary schools, (b) two pre-service primary teacher training colleges, (c) two vocational training centers, and (d) eight community education centers; (2) the extension and the supplementary furnishing and equipping of: (a) one in-service primary teacher training college, (b) the Faculty of Medicine of the University of Dar es Salaam, and (c) the Rural Health Center in Bagamoyo; (3) the provision of a total of 49 man-years of technical assistance and 35 man-years of fellowships.

Approval Date:  1973-03-27T00:00:00Z

Closing Date:      1980-12-31T00:00:00Z

Total Project Amount:   $10,300,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Livestock Project (02)

Project Status:   Closed

Description:        The proposed project would include: the development of about 35 ranches; development and improvement of about 137 large, medium, and small-scale cattle markets and 5,500 miles of stock routes and 27 holding grounds; the modernization of one meat processing plant and the construction of two new ones; and the provision of related technical services, training and assistance for project preparation.

Approval Date:  1973-04-24T00:00:00Z

Closing Date:      1980-12-31T00:00:00Z

Total Project Amount:   $18,500,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   EAC POST & TELECOM III

Project Status:   Closed

Description:       

Approval Date:  1973-05-29T00:00:00Z

Closing Date:      1979-12-31T00:00:00Z

Total Project Amount:   $-  

Borrower:          

Implementing Agency: 

 

Project Name:   POSTS & TELECOM III

Project Status:   Closed

Description:       

Approval Date:  1973-05-29T00:00:00Z

Closing Date:     

Total Project Amount:   $100,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Cotton Project

Project Status:   Closed

Description:        The Cotton Project will provide for the expansion of cotton and maize production in Geita district of Mwanza region by providing fertilizers and other inputs, tractors and maintenance facilities, storage, feeder road construction, a ginnery water supply and related technical and extension services and training. Health and education facilities will also be provided.

Approval Date:  1974-01-08T00:00:00Z

Closing Date:      1982-12-31T00:00:00Z

Total Project Amount:   $17,500,000.00

Borrower:          

Implementing Agency:

 

Project Name:   Tanzania Investment Bank Project (01)

Project Status:   Closed

Description:        The credit will meet TIB’s additional requirements to cover the estimated import component of its commitments through mid-1976.

Approval Date:  1974-02-05T00:00:00Z

Closing Date:      1980-06-30T00:00:00Z

Total Project Amount:   $6,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Tanzania Cashew Nut Development Project (01)

Project Status:   Closed

Description:        The First Cashewnut Development Project will provide construction and operation for five years of five cashew nut processing factories, of port storage facilities for cashew nut shell liquid, the establishment of cashew extension and grading services and research facilities; the construction of office and staff accommodations, water supply and education facilities; and the provision of technical services.

Approval Date:  1974-05-21T00:00:00Z

Closing Date:      1981-12-31T00:00:00Z

Total Project Amount:   $21,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   POWER II SUPPLEMENTA

Project Status:   Closed

Description:       

Approval Date:  1974-06-06T00:00:00Z

Closing Date:     

Total Project Amount:   $5,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Sites and Services Project (01)

Project Status:   Closed

Description:        The project consists of about 10,600 newly serviced plots and improvement to existing squatter settlements affecting about 8,800 dwellings and related infrastructure and community facilities including community education centers, dispensaries and markets; construction loans for purchase of building materials; a pilot nutrition project; expansion of training facilities at the Ardhi University (Ardhi Institute) and training program for Ardhi technical staff; consultants services for design and detailed engineering, overall project supervision and preparation of a follow-up project; and monitoring and evaluation of the project.

Approval Date:  1974-07-02T00:00:00Z

Closing Date:      1980-12-31T00:00:00Z

Total Project Amount:   $8,500,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Kigoma Rural Development Project

Project Status:   Closed

Description:        The project will provide, over a five year disbursement period, agricultural inputs and social and economic infrastructure for about 135 newly established ujamaa villages in Kigoma region. The projects objectives would be (a) to lift the annual per capita income of villagers from present levels of US $20.0 to about US $40.0, (b) to develop or strengthen marketing, credit, extension and adaptive research systems in the region, and (c) to improve the levels of social services in rural areas.

Approval Date:  1974-08-06T00:00:00Z

Closing Date:      1983-12-31T00:00:00Z

Total Project Amount:   $10,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Highway Maintenance Project (04)

Project Status:   Closed

Description:        The project comprises the first stage of the Borrower’s primary road maintenance program and also includes a study of the road transport industry. The two areas with the highest priority of the four into which the country has been divided were selected for inclusion in this stage of the program. Over a four year period 3,300 km of primary roads in these two areas will be rehabilitated and maintained.

Approval Date:  1974-08-06T00:00:00Z

Closing Date:      1982-12-31T00:00:00Z

Total Project Amount:   $10,200,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Kilombero Sugar Project

Project Status:   Closed

Description:        The Kilombero Sugar Project comprises: the construction of an additional sugar factory and development of an associated estate and outgrowers development capable of producing 45,000 metric tons per annum; associated facilities including staff housing, water supply and community facilities and technical services and training; and a sugar development survey.

Approval Date:  1974-09-05T00:00:00Z

Closing Date:      1980-12-31T00:00:00Z

Total Project Amount:   $18,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Program Loan Project

Project Status:   Closed

Description:       

Approval Date:  1974-12-17T00:00:00Z

Closing Date:      1975-12-31T00:00:00Z

Total Project Amount:   $30,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Mwanza Textile Project

Project Status:   Closed

Description:        The project would include: expansion of the existing cotton textile mill at Mwanza to produce an additional 20 million meters of cotton fabrics per year, bringing total production of MTL to 43 million meters. The project would be implemented by a foreign engineering company and an adviser to assist the sponsors in supervision of project implementation. The project also provides for a feasibility study of a cotton blend unit including an investigation into the export potential for Tanzanian-made textiles in East Africa.

Approval Date:  1975-06-03T00:00:00Z

Closing Date:      1981-12-31T00:00:00Z

Total Project Amount:   $15,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Dairy Development Project

Project Status:   Closed

Description:        The project comprises rehabilitation and expansion of commercial dairy farming on parastatal farms, improvement of milk collection, processing, and distribution facilities, development of the traditional dairy sector in 50 ujamaa villages, breeding of improved dairy heifers, technical services and applied investigational work for animal disease control, and future project preparation.

Approval Date:  1975-07-01T00:00:00Z

Closing Date:      1981-04-30T00:00:00Z

Total Project Amount:   $10,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Tanzania Investment Bank Project (02)

Project Status:   Closed

Description:        The objectives of the Second Tanzania Investment Bank Project loan are twofold. First, in line with the Government’s plan to reduce Tanzania’s economic dependence by increasing productive investments, the loan will provide resources for investment in medium and large scale industries, agro-business and tourism. Second, the loan will make it possible for the Bank to support TIB in further improving its procedures and project selection.

Approval Date:  1975-10-28T00:00:00Z

Closing Date:      1981-12-31T00:00:00Z

Total Project Amount:   $15,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Technical Assistance Project (01)

Project Status:   Closed

Description:       

Approval Date:  1975-11-25T00:00:00Z

Closing Date:      1982-12-31T00:00:00Z

Total Project Amount:   $6,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   National Maize Project

Project Status:   Closed

Description:        The National Maize Project comprises: the provision of maize production inputs to approximately 950 participating villages; the strengthening of extension services through training and the provision of transport and extension aids; the improvement of the distribution of maize inputs and maize marketing through the provision of required transportation; the improvement of maize research; assistance for further project preparation; and the provision of related technical services.

Approval Date:  1975-12-23T00:00:00Z

Closing Date:      1982-12-31T00:00:00Z

Total Project Amount:   $18,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Education Project (05)

Project Status:   Closed

Description:        The Fifth Education Project will assist the Government to implement its education development program by the following: (i) Support of the Rural Training Program – operational costs, building materials for about 1,500 houses, equipment, 2,000 bicycles, 500 motorcycles, and other vehicles for a rural training program together with related equipment and furniture for five rural training centers involved; (2) Extension of the Secondary School System – equipment for, improvements to and rebuilding of, where required, 15 secondary schools; and (3) Provision of Technical Assistance – the cost of specialists’ services for: the National Board of Accountants and Auditors, the Project Unit of the Ministry of National Education, a survey of secondary school and a review of the content and delivery system for primary education for the Ministry of National Education.

Approval Date:  1975-12-30T00:00:00Z

Closing Date:      1982-06-30T00:00:00Z

Total Project Amount:   $11,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Fisheries Development Project

Project Status:   Closed

Description:        The Fisheries Development Project comprises: the first stage of a long term program to develop fisheries production in Tanzania. It would support the establishment and development of commercial fisheries at three marine and one inland center on Lake Tanganyika; the development of a pilot village fisheries program and the provision of fish transport facilities on Lake Tanganyika, studies on marketing and pollution, future project preparation and the provision of related technical services.

Approval Date:  1976-07-01T00:00:00Z

Closing Date:      1981-12-31T00:00:00Z

Total Project Amount:   $9,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Sao Hill Forestry Project (01)

Project Status:   Closed

Description:        The project would, over five years (1976/77 to 1980/1981), provide for the planting and maintenance of about 16,000 ha of forests, for the maintenance of about 11,000 ha of existing plantations, and for the development of infrastructure and forest services within the project area. Specifically, the project would provide for the afforestation of a total of 15,750 ha of pulpwood plantations, surveying of the area to be planted, the establishment of nurseries, ground preparation, weeding, silvicultural treatment and disease control. In addition, some 330 ha within the designated sawlog area would be replanted during the project; 8,800 ha of existing pulpwood plantations and of about 2,500 ha of sawlog plantations would be maintained; some 164 km of primary and secondary roads and 393 km of tracks would be constructed; staff housing and 20 administrative and social buildings would be established; and financing for research, training and studies would be provided.

Approval Date:  1976-07-01T00:00:00Z

Closing Date:      1982-06-30T00:00:00Z

Total Project Amount:   $7,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Kidatu Hydroelectric Project (02)

Project Status:   Closed

Description:        The project consists of: (a) a concrete dam about 45 meters high which would form a reservoir adequate for yearly regulation of river water at Mtera; (b) an extension of the existing Kidatu hydroelectric generating station by two 50-MW units; (c) a 90 MVA transformer at Morogoro; (d) consulting services; and (e) training for TANESCO’s mid-management and professional staff.

Approval Date:  1976-07-01T00:00:00Z

Closing Date:      1981-12-31T00:00:00Z

Total Project Amount:   $30,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Tobacco Processing Project

Project Status:   Closed

Description:        The Tobacco Processing Project will, over five years (1976-1980), increase the operational capacity of the Tanzania Tobacco Processing Company facility at Morogoro from a maximum of 18.5 million kg cured leaf per annum to some 41 million kg, of which 36 million kg will be mechanically processed. This expansion will be carried out in two stages, the first comprising additions and improvements to the existing processing line through purchase of equipment, machinery and quality control devices and secondly, installation of a completely new processing line. A survey to determine timing, scale and location of any further investment in processing plant will be provided for in the project. The project will also include technical assistance and training and will provide for improved storage facilities at Morogoro and a new office and export storage in Dar es Salaam. Construction of roads, water supply facilities, offices, railroad sidings and other basic infrastructure at Morogoro will also be provided for.

Approval Date:  1976-09-07T00:00:00Z

Closing Date:      1981-12-31T00:00:00Z

Total Project Amount:   $8,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Urban Water Supply Project

Project Status:   Closed

Description:        The principal project components are as follows: (a) an earthdam across the Ngerengere river near Morogoro with tower intake, culvert and spillway; (b) production facilities including transmission pipelines, treatment and pumping stations, storage reservoirs and reticulation extension in Morogoro to increase the existing peak water production and transmission capacities, storage capacities and amend and extend the existing distribution networks up to an efficient state; (c) supply of new vehicles for the urban water supply unit in Morogoro; (d) management advisory services in MWDEM’s headquarters to assist in improving management and operation of urban water supply systems; (e) a contribution to the MWDEM’s training program for the whole sector, consisting mainly in the expansion of the Water Resources Institute (WRI) in Dar es Salaam.

Approval Date:  1976-12-23T00:00:00Z

Closing Date:      1984-12-31T00:00:00Z

Total Project Amount:   $15,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Program Credit Project

Project Status:   Closed

Description:       

Approval Date:  1977-03-15T00:00:00Z

Closing Date:      1978-03-31T00:00:00Z

Total Project Amount:   $15,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Morogoro Industrial Complex Project

Project Status:   Closed

Description:        The project finances the establishment of an Industrial Complex at Morogoro including: (i) the first phase (65 ha) of an industrial estate including necessary infrastructure and facilities for small and medium scale industries; (ii) a shoe factory to produce 2 million pairs of leather shoes and 2 million pairs of canvas shoes per year; and (iii) a leather goods factory to fabricate handbags, suitcases, jackets and various minor items from about 180,000 square meters of finished leather per year.

Approval Date:  1977-03-29T00:00:00Z

Closing Date:      1984-12-31T00:00:00Z

Total Project Amount:   $23,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Tabora Rural Development Project

Project Status:   Closed

Description:        The Tabora Rural Development Project will be implemented over a 5-year period and consists of: (1) inputs and improved extension services for crops and livestock in approximately 42 villages; (2) low-cost water supply program and funding for Water Master Plan; (3) improvement of access and network roads and strengthening of maintenance capacity; (4) reafforestation programs for 15 selected villages; (5) production of land use and land capability plan; and (6) technical assistance.

Approval Date:  1977-04-26T00:00:00Z

Closing Date:      1983-06-30T00:00:00Z

Total Project Amount:   $7,200,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Sites and Services Project (02)

Project Status:   Closed

Description:        The project consists of provision of infrastructure services to areas including about 16,000 houses in existing squatter neighborhoods, preparation of about 19,000 surveyed plots in planned residential layouts, community facilities in the upgraded areas, house improvement and construction loans, an experimental program assisting the informal sector in two project towns, and provision for equipment/vehicles and technical assistance to support the various project components. Together, these components represent a major proportion of the Government’s National Sites and Services Program over the next three years.

Approval Date:  1977-07-07T00:00:00Z

Closing Date:      1984-06-30T00:00:00Z

Total Project Amount:   $12,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Trucking Industry Rehabilitation Project

Project Status:   Closed

Description:        The major component will assist the Government in the development of five public trucking companies including technical assistance, the rehabilitation of existing vehicles, purchase of new vehicles, and the provision of truck repair facilities. The training component will increase the supply of trained trucking personnel through the provision of instructors, teaching aids and workshop equipment. Financing is also provided for replenishing depleted vehicle spare parts inventories.

Approval Date:  1977-10-04T00:00:00Z

Closing Date:      1985-06-30T00:00:00Z

Total Project Amount:   $15,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Tanzania Investment Bank Project (03)

Project Status:   Closed

Description:        The purpose of the Third Tanzania Investment Bank Project is to meet part of TIB’s foreign exchange requirements to cover its commitments through December 31, 1980. More specifically, the project will enable TIB to finance the planned increase in and diversification of its operations. In addition to its traditional financing of manufacturing enterprises, TIB expects to increase its work in agro-industries, transport and tourism.

Approval Date:  1977-12-06T00:00:00Z

Closing Date:      1983-06-30T00:00:00Z

Total Project Amount:   $15,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Mwanza / Shinyanga Rural Development Project

Project Status:   Closed

Description:        The proposed project would constitute the initial five years of a long-term development program to improve the well-being of the rural populations of Mwanza and Shinyanga regions. It will supplement and complement ongoing investment in these two regions, using the recently constituted villages as the basic unit of investment. Specifically, the project would include agricultural investments in proven agriculture technical packages, research, village verification trials, extension, livestock and forestry; financing for land-use planning; a village self-help program; road improvement investments; a water supply component; and funds for project coordination and monitoring/evaluation. The most significant risk facing the project is whether the projected implementation schedule can be maintained. Efforts have been taken to provide the support needed to execute the project according to schedule and modest assumptions have been made with regard to implementation capacity.

Approval Date:  1978-05-16T00:00:00Z

Closing Date:      1984-12-31T00:00:00Z

Total Project Amount:   $12,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Tobacco Handling Project

Project Status:   Closed

Description:        The Tobacco Handling Project will over a four-year period, aim to reduce the losses presently suffered by smallholder tobacco producers during tobacco handling. It will significantly raise smallholder incomes and increase Tanzania’s foreign exchange earnings. Specifically, the project will finance bulking bags, grading/baling centers, marketing centers, vehicles and related maintenance equipment, storage warehouses and ancillary facilities, and incremental staff and technical assistance for TAT. The project faces no special risk. While implementation could proceed at a slower rate than anticipated as a result of institutional deficiencies, this risk has been minimized through the provision of technical assistance.

Approval Date:  1978-05-16T00:00:00Z

Closing Date:      1983-04-30T00:00:00Z

Total Project Amount:   $14,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Cashewnut Development Project (02)

Project Status:   Closed

Description:        The Second Cashewnut Development Project will increase Tanzania’s annual processing capacity from 73,000 tons to 103,000 tons of raw cashewnuts all produced by smallholders, thereby increasing the local value added and creating employment for about 3,000 persons. It will increase Tanzania’s foreign exchange earnings and contribute to raising producers income. The project will finance the construction and equipping of three factories with a total processing capacity of 30,000 tons of raw nuts, the expansion of cashewnut shell liquid storage facilities, the construction of staff accommodations and water and power supply facilities. It will also finance a cashewnut research program, an occupational health hazards study, and the provision of technical assistance for CATA. The project faces commercial risks, typical of undertakings of this nature, given the uncertainty of future raw cashewnut and cashewnut kernels export prices. However, it is considered unlikely that cashewnut kernels prices will fall below a level which will reduce the economic rate of return to an unacceptable level.

Approval Date:  1978-05-16T00:00:00Z

Closing Date:      1989-06-30T00:00:00Z

Total Project Amount:   $27,500,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Morogoro Textile Project

Project Status:   Closed

Description:        The project would consist of an integrated textile mill with spinning, weaving and processing facilities to produce about 21.5 million sq. meters of blended fabrics for shirtings and suitings, as well as 650 tons of polyester/rayon yarn. The mill would use locally grown cotton and imported polyester and rayon, and the project output would represent about 11% of Tanzania’s projected total fabric production in the mid-1980s. The project includes provision for financing of technical assistance to TEXCO, and a training component. The project faces no substantial risks with regard to technical, marketing and pricing aspects. The management risk would be minimized with the involvement of experienced international firms during implementation and initial operations of the project, and a training program has been designed to ensure availability of trained manpower.

Approval Date:  1978-06-29T00:00:00Z

Closing Date:      1987-06-30T00:00:00Z

Total Project Amount:   $45,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Education Project (06)

Project Status:   Closed

Description:        The project would assist in the development of middle level management and skill training for the modern sector. It would provide for: (i) strengthening of vocational and technical education; (ii) improved accounting training; (iii) a program for management training for educational personnel; (iv) greater access of women to technical education; (v) a study aimed at increasing the effectiveness of the Institute of Education; and (vi) an improved monitoring and evaluation system. The project faces no special risks. However, close supervision of interministerial coordination at the critical stages of design, tendering and procurement will be necessary to assure successful technical execution.

Approval Date:  1978-12-12T00:00:00Z

Closing Date:      1988-06-30T00:00:00Z

Total Project Amount:   $12,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Tourism Rehabilitation Project

Project Status:   Closed

Description:        The proposed project, which will assist the Government in reversing the deterioration in tourist facilities and services, would consist of the following components: (i) works and equipment required to bring TTC hotels and lodges to appropriate operating standards; (ii) technical assistance to TTC in the field of hotel maintenance, marketing, hotel supplies, hotel communications and project administration; (iii) preparation of promotional materials and marketing campaigns aimed at the tourist travel trade; (iv) construction, furnishing and equipping, and technical assistance for a new Hotel and Tourism Training Institute (HTTI) in Dar es Salaam; (v) equipment for improving the effectiveness of the Government’s antipoaching efforts; and (vi) improvements to the terminal building of the Dar es Salaam Julius Nyerere International Airport.

Approval Date:  1978-12-12T00:00:00Z

Closing Date:      1985-06-30T00:00:00Z

Total Project Amount:   $14,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Mufindi Pulp and Paper Project

Project Status:   Closed

Description:        The Mufindi Pulp and Paper Project consists of the establishment of an integrated pulp and paper mill with an initial capacity of 60,000 tons per annum of paper and board as well as 1,400 tons of pulp for sale outside the mill. Facilities to be provided include: logging roads and equipment, a chemical pulp mill with a bleach plant, a mechanical pulp mill, two paper machines with associated stock preparation and paper finishing equipment, steam and power generation equipment, a chlorine and caustic soda plant, related pollution abatement equipment, and some supporting infrastructure. The mill will be located near the Sao Hill forest area, 15 km south of Mufindi in south-central Tanzania, some 590 km from its major market of Dar es Salaam.

Approval Date:  1979-01-04T00:00:00Z

Closing Date:      1986-12-31T00:00:00Z

Total Project Amount:   $60,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Highway Project (05)

Project Status:   Closed

Description:        The proposed project aims at increasing the long-term road maintenance capability of the Ministry of Works through provision of technical assistance for on-the-job and formal training including overseas training of engineers. The project would also finance road maintenance, rehabilitation and zonal workshop equipment and materials, training aids for the Morogoro Training School and construction of base and road camps and small number of houses for technical experts. The proposed project also includes a pilot program of repair and rehabilitation of road maintenance equipment serving the regional and district roads in the Mwanza Region and Zanzibar.

Approval Date:  1979-01-16T00:00:00Z

Closing Date:      1985-12-31T00:00:00Z

Total Project Amount:   $20,500,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Tanganyika Development Finance Corporation Ltd. Project (01)

Project Status:   Closed

Description:        The First Tanganyika Development Finance Corporation Ltd. Project will provide a line of credit to TDFL to finance its projected lending to medium scale industrial enterprises and related services, agro-processing and tourism development projects through December 1981. The project aims to further improve and enhance the role of financial intermediaries in resource allocation in First Tanzania, and to contribute to the foreign exchange resources available to medium size investment in the sectors involved. There are no major institutional risks associated with this project as TDFL is a fairly well established financing institution. However the industrial sector, the primary beneficiary of TDFL financing, faces a number of serious operating problems which could affect TDFL’s ability to expand as projected in this report.

Approval Date:  1979-06-28T00:00:00Z

Closing Date:      1984-12-31T00:00:00Z

Total Project Amount:   $11,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Tanzania Investment Bank Project (04)

Project Status:   Closed

Description:        The Fourth Tanzania Investment Bank Project’s purpose is to meet part of TIB’s foreign exchange requirements for investments in medium and large scale industrial, agro-processing, and tourism development projects through June 1982. The loan to TIB will be repayable substantially in conformity with the aggregate amortization schedule for sub-loans and investments for which withdrawals from the loan account are approved or authorized. The interest rate will be 7.9% per annum. Special Action Credit will be on standard IDA terms to Government; it will be onlent to TIB under a subsidiary loan agreement on terms equivalent to the IBRD loan.

Approval Date:  1979-07-24T00:00:00Z

Closing Date:      1986-06-30T00:00:00Z

Total Project Amount:   $25,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Dar Es Salaam Port Project

Project Status:   Closed

Description:       

Approval Date:  1979-12-27T00:00:00Z

Closing Date:      1983-06-30T00:00:00Z

Total Project Amount:   $2,500,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Tanzania Rural Development Bank Project (01)

Project Status:   Closed

Description:        The proposed project would, over a three-year period, aim at strengthening TRDB as a rural credit institution, and would help in developing its capabilities to provide needed credit for economically viable rural projects. Specifically, the project would finance a training program for TRDB’s staff and for village officials; provision of consultants and local staff to strengthen TRDB’s organizational structure; provision of new office facilities, office equipment and furniture; provision of transportation facilities; an input distribution study; and a line of credit to support TRDB’s lending program. Project benefits would be the increased capacity of TRDB to efficiently meet village requirements of credit which would help in increasing village production and farmers’ income. Recovery of the credit is the basic risk under the proposed project. However, seminars for village officials in accounting and credit concepts, improved billing procedures, efficient follow-up and supervision, and providing credit only to those villages with good credit records, should minimize this risk.

Approval Date:  1980-03-04T00:00:00Z

Closing Date:      1986-12-31T00:00:00Z

Total Project Amount:   $10,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Pyrethrum Project

Project Status:   Closed

Description:        The Pyrethrum Project aims at increasing the production of pyrethrum in the highlands of the Mbeya and Iringa Regions of Southern Tanzania. Therefore, the project will finance: (a) a program to increase smallholder pyrethrum production; (b) a program to strengthen pyrethrum research in Tanzania; (c) the strengthening of TPB’s organization and infrastructure; and (d) the improvement and maintenance of district and feeder roads. A risk faced by the Project will be a future collapse of pyrethrum export prices as a result of the development of new substitutes. However, current research is aimed mostly towards developing agricultural chemicals which will not compete with pyrethrum. Also the costs of licensing new insecticides protects pyrethrum’s market position.

Approval Date:  1980-04-17T00:00:00Z

Closing Date:      1985-12-31T00:00:00Z

Total Project Amount:   $10,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Grain Storage and Milling Project

Project Status:   Closed

Description:        The objectives of the project are to increase the National Milling Corporation’s (NMC) efficiency, eliminate losses through government subsidies and changes in prices and purchase policy, and strengthen agricultural policy-making mechanism. The project comprises: (i) rehabilitation of godowns and silos; (ii) construction of storage capacity; (iii) tarpaulins and polythene sheets; (iv) pilot programs for controlled open storage and dryers; (v) expansion of maize milling capacity; (vi) rehabilitation of existing mills; (vii) laboratory facilities for grain and flour analysis; (viii) lorries, radio communication network, utility vehicles, passenger cars, and motorcycles; (ix) staff training; (x) technical assistance to improve management, information systems, and planning; and (xi) financing for staff, vehicles, equipment, surveys and analytic work for the Marketing Development Bureau and the Project Preparation and Monitoring Bureau. The investment would improve management practices and strengthen the institutional capacity of NMC to procure, transport, store, and mill food crops.

Approval Date:  1980-05-06T00:00:00Z

Closing Date:      1992-06-30T00:00:00Z

Total Project Amount:   $43,000,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency: 

 

Project Name:   Smallholder Tea Consolidation Project

Project Status:   Closed

Description:        The Smallholder Tea Consolidation Project will, over a five-year period, consolidate ongoing TTA operations and provide additional processing facilities. It will aim to (i) strengthen TTA’s capacity to handle green leaf produced by smallholder tea plantings including those established under the Smallholder Tea Development Project; (ii) maximize the production benefits of smallholders in those areas where an alternative to tea planting is not available; (iii) strengthen TTA’s financial viability; and (iv) increase Government’s export earnings from the tea industry. Specifically, the project will finance construction of one new factory; extending and reequipping of five factories; transport facilities; spare parts; workshop tools; establishment of fuelwood plantations; planting of 200 ha and infilling of the equivalent of 630 ha of tea; construction and maintenance of 176 km of tea roads; and incremental staff and technical assistance for TTA. The major risk of the project is institutional deficiencies; this risk has been minimized through the provision of technical assistance in the key positions of factory operations. The forecasts of world tea prices have been conservatively projected based on key producing countries’ abilities for expansion of tea production.

Approval Date:  1980-06-03T00:00:00Z

Closing Date:      1988-12-31T00:00:00Z

Total Project Amount:   $14,000,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency: 

 

Project Name:   Songo Songo Drillings Project

Project Status:   Closed

Description:       

Approval Date:  1980-06-12T00:00:00Z

Closing Date:      1982-09-30T00:00:00Z

Total Project Amount:   $30,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Education Project (07)

Project Status:   Closed

Description:        The primary part of the Seventh Education Project will include: construction of about 360 primary classrooms in four least developed districts, and provision of teaching materials to schools in sixteen rural districts. The secondary education part will include: construction of a demonstration school at the University of Dar es Salaam and of two lower secondary schools; construction of science and mathematics streams in new, and rehabilitation of such streams in existing schools; provision of 100 staff-years of graduate teachers of science and mathematics. The teacher training part will include: construction of a new teacher training college, a rehabilitation of an existing teacher training college in Zanzibar. Educational quality support services will provide storage facilities to Tanzania Elimu Supplies, a parastatal, and fellowships to the National Examination Council.

Approval Date:  1980-07-29T00:00:00Z

Closing Date:      1990-12-31T00:00:00Z

Total Project Amount:   $25,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Technical Assistance Project (02)

Project Status:   Closed

Description:       

Approval Date:  1980-08-08T00:00:00Z

Closing Date:      1988-06-30T00:00:00Z

Total Project Amount:   $11,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Coconut Pilot Project

Project Status:   Closed

Description:        The Coconut Pilot Project will, over a five year period, prepare a firm base for the rehabilitation of the coconut industry in Tanzania. It will finance varietal trials and improved maintenance and rehabilitation trials over an area of about 1,200 ha; a seed garden for the product of hybrid seed nuts; soil and hydrological surveys; the preparation of a feasibility study for the next phase of coconut development; and technical assistance, consulting services, and training of Tanzanian staff. The project faces few risks, although the implementation schedule is dependent on the timely acquisition of seed nuts from other coconut growing countries.

Approval Date:  1980-10-07T00:00:00Z

Closing Date:      1989-03-31T00:00:00Z

Total Project Amount:   $6,800,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency: 

 

Project Name:   Export Rehabilitation Program Project

Project Status:   Closed

Description:       

Approval Date:  1981-04-21T00:00:00Z

Closing Date:      1983-03-31T00:00:00Z

Total Project Amount:   $50,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Telecommunication Project (01)

Project Status:   Closed

Description:        The project would cover part of TPTC’s current investment program (1980-84). It would improve services in the sector of telecommunications in Tanzania through extending local services and providing reliable urban and long distance networks. It would also provide basic telecommunications facilities to rural areas and to Zanzibar. Specifically, the project would finance: (a) construction of about 550 km of overhead line routes; of about 12 VHF or UHF radio links and of 4 microwave links; installation of power supply equipment and of about 850 channels of rural carriers; of about 600 additional channels of multiplex equipment in broadband transmission systems; and of a digital telephone exchange in Zanzibar; (b) expansion of the local cable network at about 90 urban and rural centers; provision of dropwire and of about 700 teleprinters; (c) importation of cement and other construction materials; (d) provision of an air-conditioning plant, vehicles, training equipment and spare parts; and (e) provision for studies, overseas training and fellowships.

Approval Date:  1981-07-21T00:00:00Z

Closing Date:      1987-06-30T00:00:00Z

Total Project Amount:   $27,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Songo Songo Petroleum Exploration Project (02)

Project Status:   Closed

Description:       

Approval Date:  1981-12-22T00:00:00Z

Closing Date:      1983-12-31T00:00:00Z

Total Project Amount:   $20,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Technical Assistance Project (03)

Project Status:   Closed

Description:       

Approval Date:  1982-02-09T00:00:00Z

Closing Date:      1987-06-30T00:00:00Z

Total Project Amount:   $12,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Sao Hill Forestry Project (02)

Project Status:   Closed

Description:        The project would finance the further development of about 18,000 ha of existing forest plantations and the establishment and development of about 10,000 ha of new plantations. The project would also support the establishment of nurseries; fire control measures; forest research; construction of secondary roads and tracks; construction and maintenance of staff houses; and strengthening of the Forest Division. The project would meet growing domestic demand for softwood for sawn timber and pulp and paper production, as well as reduce pressure on environmentally important indigenous forests.

Approval Date:  1982-04-13T00:00:00Z

Closing Date:      1990-12-31T00:00:00Z

Total Project Amount:   $12,000,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency: 

 

Project Name:   W/S MOROGORO

Project Status:   Closed

Description:       

Approval Date:  1982-06-24T00:00:00Z

Closing Date:     

Total Project Amount:   $4,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Dar Es Salaam Sewerage and Sanitation Project

Project Status:   Closed

Description:        The project would be the first phase of a long-range program to rehabilitate the existing sewerage system and to develop basic sanitation services in Dar es Salaam. It would focus on low-cost, on-plot sanitation and the development of the services, institutions, and management practices required for improved sewerage and sanitation. The project would finance construction of pit latrines and replacement or conversion of existing on-plot sanitation units; improvement of the Dar es Salaam City Council (DCC) pit emptying service; establishment and development of a Sewerage and Sanitation Department (DSSD) in DCC; provision of offices, workshops, equipment and spare parts; and technical assistance and training both for DSSD and the National Urban Water Authority. The project would improve sewerage and sanitation services in Dar es Salaam and strengthen urban water supply services throughout the country.

Approval Date:  1982-12-21T00:00:00Z

Closing Date:      1988-12-31T00:00:00Z

Total Project Amount:   $22,500,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Coal Engineering Project

Project Status:   Closed

Description:       

Approval Date:  1983-05-19T00:00:00Z

Closing Date:      1990-06-30T00:00:00Z

Total Project Amount:   $6,300,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Mufindi Pulp and Paper Technical Assistance Project

Project Status:   Closed

Description:       

Approval Date:  1983-05-19T00:00:00Z

Closing Date:      1991-12-31T00:00:00Z

Total Project Amount:   $18,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Power – Mtera (04)

Project Status:   Closed

Description:        In order to meet the increase in local demand for electricity through 1990, Tanzania is undertaking this Fourth Power Project. The venture will develop renewable energy resources, new job opportunities as well as supplying power to isolated areas. In addition, it will replace production from diesel sets, thus providing substantial foreign exchange savings as well as laying the basis for improved power sector coordination, tariff policy, power system control and load dispatching practices. A further objective of the project is to maintain and further improve Tanesco’s operations through support of its training and management programs. Specifically, the project components include: (a) construction of a water intake; a headrace tunnel as well as a vertical penstock system leading to an underground powerhouse; a tailrace tunnel; a switchyard; and ancillary buildings. The project will also include: (b) construction of a system control center at Dar es Salaam; (c) rehabilitation of the existing Ubongo diesel station and other power system facilities. Funds are also intended for: (d) training and management programmes; and finally for (e) consultancy services.

Approval Date:  1983-07-26T00:00:00Z

Closing Date:      1991-12-31T00:00:00Z

Total Project Amount:   $35,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Technical Assistance Project (04)

Project Status:   Closed

Description:       

Approval Date:  1984-10-16T00:00:00Z

Closing Date:      1989-06-30T00:00:00Z

Total Project Amount:   $10,000,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency: 

 

Project Name:   Port Rehabilitation Project

Project Status:   Closed

Description:        The Port Rehabilitation Project is designed to provide for the rehabilitation and modernization of the Port of Dar es Salaam. This is Tanzania’s major port which also serves as an important regional port for several neighboring countries (Burundi, Malawi, Rwanda, Zaire, Zambia). The proposed project will provide special container handling facilities and equipment, replace some deteriorated general cargo equipment, modernize grain handling facilities, and rehabilitate lighterage facilities and the petroleum jetty. The project will also repave sections of berths, and provide for a review of additional rehabilitation requirements, technical assistance and training, and consultancy services.

Approval Date:  1984-12-13T00:00:00Z

Closing Date:      1992-12-31T00:00:00Z

Total Project Amount:   $27,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Petroleum Sector Technical Assistance Project

Project Status:   Closed

Description:       

Approval Date:  1985-06-06T00:00:00Z

Closing Date:      1992-12-31T00:00:00Z

Total Project Amount:   $8,000,000.00

Borrower:           GOVERNMENT

Implementing Agency:  TPDC

 

 

Projects Financed by World Bank in Tanzania – Mwinyi Presidency (5 November 1985 – 23 November 1995)

The Beginning of Economic and Political ReformsThe World Bank funded a total of 33 projects during Nyerere’s administration, which cost a total of $ 1,871,250,000.00 between 1985 and 1995.

This is the full list of such projects:

Project Name: Highway Project (06)

Project Status: Closed

Details:
Approval Date: 1986-05-06T00: 00: 00Z
Closing Date: 1994-06-30T00: 00: 00Z
Total project costs: $ 50,000,000.00
Borrower: Government
Project Implementer: Ministry of Labor

Project Name: Electrical system repair project

Project Status: Closed
Details:
Approval Date: 1986-05-06T00: 00: 00Z
Closing Date: 1992-06-30T00: 00: 00Z
Total project costs: $ 40,000,000.00
Borrower: Government
Project Implementer: Tanzania Electricity Corporation (TANESCO)

Project Name: A multi-sectoral reform project

Project Status: Closed
Details:
Approval Date: 1986-11-20T00: 00: 00Z
Closing Date: 1989-12-31T00: 00: 00Z
Total project costs: $ 50,000,000.00
Borrower: Government
Project Implementer: Ministry of Agriculture and Transport / Labor

Project Name: Telecommunications Project (02)

Project Status: Closed
Details:
Approval Date: 1987-05-28T00: 00: 00Z
Closing Date: 1992-12-31T00: 00: 00Z
Total project costs: $ 23,000,000.00
Borrower: Government
Project Implementer: Tanzania Postal and Telecommunications Corporation (TPTC)

Project Name: A multi-sector recovery project

Project Status: Closed
Details:
Approval Date: 1988-01-19T00: 00: 00Z
Closing Date:
Total project costs: $ 30,000,000.00
Borrower: Government
Project Implementer: Ministry of Finance and Planning

Project Name: Project to Improve Sales of Agricultural Products Abroad

Project Status: Closed
Details:
Approval Date: 1988-03-29T00: 00: 00Z
Closing Date: 1996-06-30T00: 00: 00Z
Total project costs: $ 30,000,000.00
Borrower: Government
Project Implementer: Ministry of Finance

Project Name: National Agricultural Research Project (NRA)

Project Status: Closed
Details:
Approval Date: 1988-12-13T00: 00: 00Z
Closing Date: 1997-12-31T00: 00: 00Z
Total project costs: $ 8,300,000.00
Borrower: Government
Project Implementer: Ministry of Agriculture

Project Name: Industrial and Business Improvement Loan Project

Project Status: Closed
Details:
Approval Date: 1988-12-13T00: 00: 00Z
Closing Date: 1993-12-31T00: 00: 00Z
Total project costs: $ 135,000,000.00
Borrower: Government
Project Implementer: Ministry of Finance

Project Name: IND TRADE ADJ

Project Status: Closed
Details:
Approval Date: 1989-03-13T00: 00: 00Z
Closing Date:
Total project costs: $ 12,500,000.00
Borrower: Government
Project Implementer:

Project Name: National Agricultural & Livestock Extension Rehabilitation Project (NALERP)

Project Status: Closed
Details:
Approval Date: 1989-03-21T00: 00: 00Z
Closing Date: 1997-03-31T00: 00: 00Z
Total project costs: $ 18,400,000.00
Borrower: Government
Project Implementer: Ministry of Agriculture

Project Name: Cashew and Coconut Tree Production Project

Project Status: Closed
Details:
Approval Date: 1989-06-27T00: 00: 00Z
Closing Date: 1996-06-30T00: 00: 00Z
Total project costs: $ 25,100,000.00
Borrower: Government
Project Implementer: Ministry of Agriculture

Project Name: Modern Port Improvement Project (02)

Project Status: Closed
Details:
Approval Date: 1990-02-27T00: 00: 00Z
Closing Date: 2000-06-30T00: 00: 00Z
Total project costs: $ 37,000,000.00
Borrower: Government
Project Implementer: Tanzania Ports Authority

Project Name: Health and Nutrition Project

Project Status: Closed
Details:
Approval Date:
Closing Date: 1999-06-30T00: 00: 00Z
Total project costs: $ 47,600,000.00
Borrower: Government
Project Implementer: Ministry of Health Tanzania / Local Government

Project Name: Agricultural Repair Loan Project

Project Status: Closed
Details:
Approval Date: 1990-03-29T00: 00: 00Z
Closing Date: 1994-06-30T00: 00: 00Z
Total project costs: $ 200,000,000.00
Borrower: Government
Project Implementer: Ministry of Finance

Project Name: Education Planning and Improvement Project

Project Status: Closed
Details:
Approval Date: 1990-05-22T00: 00: 00Z
Closing Date: 1997-12-31T00: 00: 00Z
Total project costs: $ 38,300,000.00
Borrower: Government of Tanzania
Project Implementer: Ministry of Education

Project Name: Integrated Strategic Roads Project

Project Status: Closed
Details:
Approval Date: 1990-05-31T00: 00: 00Z
Closing Date: 1999-06-30T00: 00: 00Z
Total project costs: $ 180,400,000.00
Borrower: Government of Tanzania
Project Implementer: Ministry of Labor and Communications

Project Name: Agricultural Reform

Project Status: Closed
Details:
Approval Date: 1990-12-14T00: 00: 00Z
Closing Date:
Total project costs: $ 16,100,000.00
Borrower:
Project Implementer:

Project Name: Petroleum Sector Rehabilitation Project (PSRP)

Project Status: Closed

Details:
Approval Date: 1991-01-15T00: 00: 00Z
Closing Date: 2001-06-30T00: 00: 00Z
Total project costs: $ 44,000,000.00
Borrower:
Project Implementer: Tanzania Ports Authority (TPDC) / Government

Project Name: Transportation Improvement Project (02)

Project Status: Closed
Details:
Approval Date: 1991-06-13T00: 00: 00Z
Closing Date: 2002-12-31T00: 00: 00Z
Total project costs: $ 76,000,000.00
Borrower: Government
Project Implementer: Railway Authority

Project Name: Urban Sector Construction Project

Project Status: Closed
Details:
Approval Date: 1991-07-30T00: 00: 00Z
Closing Date: 1996-12-30T00: 00: 00Z
Total project costs: $ 11,200,000.00
Borrower: Government
Project Implementer: Ministry of Local Government

Project Name: Financial Sector Improvement Project

Project Status: Closed

Details:
Approval Date: 1991-11-14T00: 00: 00Z
Closing Date: 1994-12-31T00: 00: 00Z
Total project costs: $ 200,000,000.00
Borrower: Government
Project Implementer: Ministry of Finance

Project Name: Agricultural Reform Project

Project Status: Closed
Details:
Approval Date: 1991-11-26T00: 00: 00Z
Closing Date:
Total project costs: $ 11,300,000.00
Borrower:
Project Implementer: Government

Project Name: Electrical Systems Construction and Technical Support Project

Project Status: Closed
Details:
Approval Date: 1992-01-14T00: 00: 00Z
Closing Date: 1996-06-30T00: 00: 00Z
Total project costs: $ 10,000,000.00
Borrower: Government of Tanzania
Project Implementer: Tanzania Electricity Corporation (TANESCO)

Project Name: Forest Resource Management Project (FRMP)

Project Status: Closed
Details:
Approval Date: 1992-02-11T00: 00: 00Z
Closing Date: 1999-06-30T00: 00: 00Z
Total project costs: $ 18,300,000.00
Borrower: Government of Tanzania
Project Implementer: Ministry of Natural Resources and Tourism

Project Name: Financial and Legal Management Upgrading Project (FILMUP)

Project Status: Closed
Details:
Approval Date: 1992-07-09T00: 00: 00Z
Closing Date: 2000-06-30T00: 00: 00Z
Total project costs: $ 20,000,000.00
Borrower:
Project Implementer: Government

 

Project Name: Financial Sector

Project Status: Closed
Details:
Approval Date: 1992-12-23T00: 00: 00Z
Closing Date:
Total project costs: $ 11,300,000.00
Borrower: Government
Project Implementer: Ministry of Finance

Project Name: Telecommunications (03)

Project Status: Closed
Details:
Approval Date: 1993-04-27T00: 00: 00Z
Closing Date: 2000-12-31T00: 00: 00Z
Total project costs: $ 74,450,000.00
Borrower: Government of Tanzania
Project Implementer: Government of Tanzania

Project Name: Electricity Project (06)

Project Status: Closed
Details:
Approval Date: 1993-05-06T00: 00: 00Z
Closing Date: 2001-06-30T00: 00: 00Z
Total project costs: $ 200,000,000.00
Borrower: Ministry of Energy
Project Implementer: Tanzania Electricity Corporation (TANESCO)

Project Name: Parastatal and Public Sector Reform Project (PPRP)

Project Status: Closed
Details:
Approval Date: 1993-06-10T00: 00: 00Z
Closing Date: 2001-01-31T00: 00: 00Z
Total project costs: $ 34,900,000.00
Borrower: Government of Tanzania
Project Implementer: Ministry of Finance

Project Name: Agricultural Sector Management Project

Project Status: Closed
Details:
Approval Date: 1993-07-20T00: 00: 00Z
Closing Date: 2001-06-30T00: 00: 00Z
Total project costs: $ 24,500,000.00
Borrower: Government of Tanzania
Project Implementer: Government

Project Name: Integrated Roads Project (02)

Project Status: Closed
Details:
Approval Date: 1994-04-07T00: 00: 00Z
Closing Date: 2006-12-30T00: 00: 00Z
Total project costs: $ 170,200,000.00
Borrower: Government
Project Implementer: Government

Project Name: Technical Assistance Project for the Development of the Tanzania Mining Sector

Project Status: Closed
Details:
Approval Date: 1994-07-28T00: 00: 00Z
Closing Date: 2001-12-31T00: 00: 00Z
Total project costs: $ 12,500,000.00
Borrower:
Project Implementer: Government

 

Project Name: Project for the Improvement of Financial Institutions

Project Status: Closed
Details:
Approval Date: 1995-08-03T00: 00: 00Z
Closing Date: 1999-06-30T00: 00: 00Z
Total project costs: $ 10,900,000.00
Borrower:
Project Implementer: Bank of Tanzania (BOT)

 

Projects Financed by World Bank in Tanzania – Benjamin Mkapa Presidency (23 November 1995 – 21 December 2005)

President Benjamin Mkapa
President Benjamin Mkapa

The World bank financed a total of 51 projects during Nyerere presidency, amounting to a sum of $2,548,610,000.00 between year 1995 – 2005.

 

Here is a full list of those projects:

 

Project Name:   Urban Sector Rehabilitation Project

Description:       

Approval Date:  1996-05-23T00:00:00Z

Closing Date:      2004-12-31T00:00:00Z

Total Project Amount:   $105,000,000.00

Borrower:           GOVT

Implementing Agency:  PRESIDENT’S OFFICE REGIONAL AND LOCAL GOVERNMENTS

 

Project Name:   National Agricultural Extension Program (NAEP) (02)

Project Status:   Closed

Description:       

Approval Date:  1996-07-11T00:00:00Z

Closing Date:      2003-12-31T00:00:00Z

Total Project Amount:   $31,100,000.00

Borrower:           GOVT

Implementing Agency:  MIN OF FINANCE

 

Project Name:   TZ-River Basin Management & Small Holder Irrigation Improvements

Project Status:   Closed

Description:       

Approval Date:  1996-07-11T00:00:00Z

Closing Date:      2004-06-30T00:00:00Z

Total Project Amount:   $26,300,000.00

Borrower:           GOVERNMENT

Implementing Agency:  MOA; MWEM

 

Project Name:   TZ-Lake Victoria Environment (IDA)

Project Status:   Closed

Description:       

Approval Date:  1996-07-30T00:00:00Z

Closing Date:      2005-12-31T00:00:00Z

Total Project Amount:   $10,100,000.00

Borrower:           GOVT OF TANZANIA

Implementing Agency:  VICE PRESIDENT’S OFFICE

 

Project Name:   TZ: LAKE VICTORIA ENV. PROJ. (GEF)

Project Status:   Closed

Description:       

Approval Date:  1996-07-30T00:00:00Z

Closing Date:      2002-12-31T00:00:00Z

Total Project Amount:   $-  

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency:  VICE PRESIDENT’S OFFICE

 

Project Name:   Tanzania Structural Adjustment Credit

Project Status:   Closed

Description:       

Approval Date:  1997-06-20T00:00:00Z

Closing Date:      2000-06-30T00:00:00Z

Total Project Amount:   $125,000,000.00

Borrower:          

Implementing Agency:  GOVT

 

Project Name:   SAC I

Project Status:   Closed

Description:       

Approval Date:  1997-06-20T00:00:00Z

Closing Date:     

Total Project Amount:   $3,900,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Human Resource Development I

Project Status:   Closed

Description:       

Approval Date:  1997-10-07T00:00:00Z

Closing Date:      2005-12-31T00:00:00Z

Total Project Amount:   $20,900,000.00

Borrower:           GOVT

Implementing Agency:  MINISTRY OF EDUCATION AND CULTURE

 

Project Name:   SACI – IDA REFLOWS

Project Status:   Closed

Description:       

Approval Date:  1997-12-15T00:00:00Z

Closing Date:     

Total Project Amount:   $2,600,000.00

Borrower:          

Implementing Agency:  GOVT

 

Project Name:   Tanzania TARP II

Project Status:   Closed

Description:       

Approval Date:  1998-01-29T00:00:00Z

Closing Date:      2004-06-30T00:00:00Z

Total Project Amount:   $21,800,000.00

Borrower:           GOVT

Implementing Agency:  MINISTRY OF FIN

 

Project Name:   Tax Administration Project

Project Status:   Closed

Description:       

Approval Date:  1999-03-30T00:00:00Z

Closing Date:      2006-12-31T00:00:00Z

Total Project Amount:   $40,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   IDA Reflow SAC I

Project Status:   Closed

Description:       

Approval Date:  1999-04-01T00:00:00Z

Closing Date:     

Total Project Amount:   $1,500,000.00

Borrower:          

Implementing Agency:  GOVT

 

Project Name:   Commercial Debt Reduction Program for URT under IDA DRF

Project Status:   Closed

Description:       

Approval Date:  1999-06-29T00:00:00Z

Closing Date:      2004-12-31T00:00:00Z

Total Project Amount:   $-  

Borrower:           GRANT

Implementing Agency:  IDA

 

Project Name:   Rural and Micro Financial Services Project

Project Status:   Closed

Description:       

Approval Date:  1999-08-26T00:00:00Z

Closing Date:      2004-12-31T00:00:00Z

Total Project Amount:   $2,000,000.00

Borrower:           GOVT OF TANZANIA

Implementing Agency:  BANK OF TANZANIA

 

Project Name:   Financial Institutions Development Project (02)

Project Status:   Closed

Description:       

Approval Date:  1999-08-31T00:00:00Z

Closing Date:      2006-12-31T00:00:00Z

Total Project Amount:   $27,500,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   PUBLIC SERV. REF PROG

Project Status:   Closed

Description:       

Approval Date:  1999-12-02T00:00:00Z

Closing Date:      2007-12-31T00:00:00Z

Total Project Amount:   $41,200,000.00

Borrower:           GOVT OF TANZANIA

Implementing Agency:  CIVIL SERVICE DEPARTMENT

 

Project Name:   Privatization & Priv Sec Dev

Project Status:   Closed

Description:       

Approval Date:  1999-12-14T00:00:00Z

Closing Date:      2009-09-30T00:00:00Z

Total Project Amount:   $45,900,000.00

Borrower:           UNITED REP OF TANZANIA

Implementing Agency: 

 

Project Name:   Fy00 IDA Reflow – SAC I

Project Status:   Closed

Description:       

Approval Date:  1999-12-28T00:00:00Z

Closing Date:     

Total Project Amount:   $1,100,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   Programmatic Structural Adjustment Credit  CR.no.3379-TA

Project Status:   Closed

Description:       

Approval Date:  2000-06-15T00:00:00Z

Closing Date:      2004-05-31T00:00:00Z

Total Project Amount:   $190,000,000.00

Borrower:           GOV

Implementing Agency:  GOV

 

Project Name:   Health Sector Development Program

Project Status:   Closed

Description:       

Approval Date:  2000-06-15T00:00:00Z

Closing Date:      2003-12-31T00:00:00Z

Total Project Amount:   $22,000,000.00

Borrower:           UNITED REPUBLIC OF TANZANIA

Implementing Agency:  MINISTRY OF HEALTH & MIN OF REGIONAL ADMIN AND LOCAL GOVT

 

Project Name:   Social Action Fund Project

Project Status:   Closed

Description:       

Approval Date:  2000-08-22T00:00:00Z

Closing Date:      2005-06-30T00:00:00Z

Total Project Amount:   $60,000,000.00

Borrower:           GOT

Implementing Agency:  GOT (PRESIDENT’S OFFICE)

 

Project Name:   IDA Reflow – PSAC I

Project Status:   Closed

Description:       

Approval Date:  2001-01-29T00:00:00Z

Closing Date:     

Total Project Amount:   $770,000.00

Borrower:          

Implementing Agency:  GOV

 

Project Name:   Regional Trade Facilitation Project – Tanzania

Project Status:   Closed

Description:       

Approval Date:  2001-04-03T00:00:00Z

Closing Date:      2013-06-30T00:00:00Z

Total Project Amount:   $15,000,000.00

Borrower:           MINISTRY OF FINANCE

Implementing Agency:  AFRICAN TRADE INSURANCE AGENCY

 

Project Name:   Lower Kihansi Environmental Management Project

Project Status:   Closed

Description:       

Approval Date:  2001-07-03T00:00:00Z

Closing Date:      2011-06-30T00:00:00Z

Total Project Amount:   $6,300,000.00

Borrower:           UNITED REPUBLIC OF TANZANIA

Implementing Agency: 

 

Project Name:   Songo Songo Natural Gas Development and Power Generation Project

Project Status:   Closed

Description:       

Approval Date:  2001-10-09T00:00:00Z

Closing Date:      2010-12-31T00:00:00Z

Total Project Amount:   $183,000,000.00

Borrower:           GOVT

Implementing Agency:  SONGAS; GOT

 

Project Name:   Primary Education Development Program

Project Status:   Closed

Description:       

Approval Date:  2001-10-09T00:00:00Z

Closing Date:      2004-10-31T00:00:00Z

Total Project Amount:   $150,000,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency:  PRIME MINISTER’S OFFICE

 

Project Name:   LVEMP Supplemental

Project Status:   Closed

Description:       

Approval Date:  2001-12-13T00:00:00Z

Closing Date:     

Total Project Amount:   $5,000,000.00

Borrower:          

Implementing Agency: 

 

Project Name:   IDA Fifth Dimension Credit -FY02 Supplemental Release

Project Status:   Closed

Description:       

Approval Date:  2002-02-12T00:00:00Z

Closing Date:     

Total Project Amount:   $580,000.00

Borrower:          

Implementing Agency:  GOV

 

Project Name:   Forest Conservation and Management Project

Project Status:   Closed

Description:       

Approval Date:  2002-02-26T00:00:00Z

Closing Date:      2009-12-31T00:00:00Z

Total Project Amount:   $31,100,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency:  MINISTRY OF NATURAL RESOURCES AND TOURISM

 

Project Name:   Rural Water Supply and Sanitation Project

Project Status:   Closed

Description:       

Approval Date:  2002-03-26T00:00:00Z

Closing Date:      2008-06-30T00:00:00Z

Total Project Amount:   $26,000,000.00

Borrower:           GOV TANZANIA

Implementing Agency:  MINISTRY OF WATER AND LIVESTOCK DEVELOPMENT

 

Project Name:   Dar es Salaam Water Supply and Sanitation Project

Project Status:   Closed

Description:       

Approval Date:  2003-05-27T00:00:00Z

Closing Date:      2010-11-30T00:00:00Z

Total Project Amount:   $61,500,000.00

Borrower:           GOT

Implementing Agency:  MOWLD; DAWASA

 

Project Name:   Participatory Agricultural Development and Empowerment Project

Project Status:   Closed

Description:       

Approval Date:  2003-05-27T00:00:00Z

Closing Date:      2010-06-30T00:00:00Z

Total Project Amount:   $56,580,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency:  MINISTRY OF AGRICULTURE AND FOOD SECURITY

 

Project Name:   Tanzania First Poverty Reduction Support Credit

Project Status:   Closed

Description:       

Approval Date:  2003-05-29T00:00:00Z

Closing Date:      2006-03-31T00:00:00Z

Total Project Amount:   $132,000,000.00

Borrower:           REPUBLIC OF TANZANIA

Implementing Agency:  MINISTRY OF FINANCE

 

Project Name:   Tanzania FY03 IDA Reflows PSAC1

Project Status:   Closed

Description:       

Approval Date:  2003-06-27T00:00:00Z

Closing Date:     

Total Project Amount:   $390,000.00

Borrower:           UNITED REPUBLIC OF TANZANIA

Implementing Agency:  MINISTRY OF FINANCE

 

Project Name:   Eastern Arc Forests Conservation and Management Project

Project Status:   Closed

Description:       

Approval Date:  2003-07-03T00:00:00Z

Closing Date:      2009-12-31T00:00:00Z

Total Project Amount:   $-  

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency:  MINISTRY OF NATURAL RESOURCES & TOURISM

 

Project Name:   Multi-Sectoral AIDS Project

Project Status:   Closed

Description:       

Approval Date:  2003-07-07T00:00:00Z

Closing Date:      2010-03-31T00:00:00Z

Total Project Amount:   $70,000,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency:  GOT

 

Project Name:   Second Health Sector Development Project

Project Status:   Closed

Description:       

Approval Date:  2003-12-16T00:00:00Z

Closing Date:      2011-12-31T00:00:00Z

Total Project Amount:   $65,000,000.00

Borrower:           UNITED REPUBLIC OF TANZANIA

Implementing Agency:  MINISTRY OF HEALTH AND PORALG

 

Project Name:   Central Transport Corridor Project

Project Status:   Closed

Description:       

Approval Date:  2004-04-29T00:00:00Z

Closing Date:      2009-12-31T00:00:00Z

Total Project Amount:   $122,000,000.00

Borrower:           REPUBLIC OF TANZANIA

Implementing Agency:  TANROADS; MOCT ZANZIBAR AND TRC/RAHCO

 

Project Name:   Secondary Education Development Program

Project Status:   Closed

Description:       

Approval Date:  2004-06-08T00:00:00Z

Closing Date:      2007-12-31T00:00:00Z

Total Project Amount:   $150,000,000.00

Borrower:           UNITED REPUBLIC OF TANZANIA

Implementing Agency:  MINISTRY OF EDUCATION AND CULTURE

 

Project Name:   Tanzania Emergency Power Supply

Project Status:   Closed

Description:       

Approval Date:  2004-06-08T00:00:00Z

Closing Date:      2006-07-31T00:00:00Z

Total Project Amount:   $43,800,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency:  MINISTRY OF ENERGY AND MINERALS

 

Project Name:   Tanzania-FY04 IDA Reflow

Project Status:   Closed

Description:       

Approval Date:  2004-06-30T00:00:00Z

Closing Date:     

Total Project Amount:   $190,000.00

Borrower:           UNITED REPUBLIC OF TANZANIA

Implementing Agency:  MINISTRY OF FINANCE

 

Project Name:   Second Poverty Reduction Support Credit

Project Status:   Closed

Description:       

Approval Date:  2004-07-29T00:00:00Z

Closing Date:      2005-06-30T00:00:00Z

Total Project Amount:   $150,000,000.00

Borrower:           UNITED REPUBLIC OF TANZANIA

Implementing Agency:  MINISTRY OF FINANCE

 

Project Name:   Wildlife and Livestock Utilization

Project Status:   Closed

Description:       

Approval Date:  2004-09-16T00:00:00Z

Closing Date:     

Total Project Amount:   $-  

Borrower:          

Implementing Agency: 

 

Project Name:   Lake Victoria Environmental Management Project Second Supplemental Credit

Project Status:   Closed

Description:       

Approval Date:  2004-10-21T00:00:00Z

Closing Date:     

Total Project Amount:   $3,500,000.00

Borrower:           REPUBLIC OF TANZANIA

Implementing Agency:  OFFICE OF THE VICEPRESIDENT

 

Project Name:   Tanzania Second Social Action Fund

Project Status:   Closed

Description:       

Approval Date:  2004-11-30T00:00:00Z

Closing Date:      2013-06-30T00:00:00Z

Total Project Amount:   $150,000,000.00

Borrower:           UNITED REPUBLIC OF TANZANIA

Implementing Agency:  TASAF MANAGEMENT UNIT; PRESIDENT‘S OFFICE

 

Project Name:   Local Government Support Project

Project Status:   Closed

Description:       

Approval Date:  2004-11-30T00:00:00Z

Closing Date:      2012-06-30T00:00:00Z

Total Project Amount:   $52,000,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency:  PRESIDENT’S OFFICE RALG

 

Project Name:   Marine and Coastal Environmental Management Project

Project Status:   Closed

Description:       

Approval Date:  2005-07-21T00:00:00Z

Closing Date:      2013-02-15T00:00:00Z

Total Project Amount:   $-  

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency:  MINISTRY OF NATURAL RESOURCES AND TOURISM

 

Project Name:   Marine and Coastal Environment Management

Project Status:   Closed

Description:       

Approval Date:  2005-07-21T00:00:00Z

Closing Date:      2013-02-15T00:00:00Z

Total Project Amount:   $51,000,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency:  GOVERNMENT OF TANZANIA

 

Project Name:   Tanzania Poverty Reduction Support Credit 3

Project Status:   Closed

Description:       

Approval Date:  2005-09-08T00:00:00Z

Closing Date:      2006-06-30T00:00:00Z

Total Project Amount:   $150,000,000.00

Borrower:           THE REPUBLIC OF TANZANIA

Implementing Agency:  MINISTRY OF FINANCE

 

Project Name:   Private Sector/MSME Competitiveness

Project Status:   Closed

Description:       

Approval Date:  2005-12-15T00:00:00Z

Closing Date:      2018-07-31T00:00:00Z

Total Project Amount:   $95,000,000.00

Borrower:           GOVERNMENT OF TANZANIA

Implementing Agency:  MINISTRY OF FINANCE

 

Project Name:   TZ-Vulnerability Survey (FY06)

Project Status:   Closed

Description:       

Approval Date:  2005-12-30T00:00:00Z

Closing Date:      2005-12-31T00:00:00Z

Total Project Amount:   $-  

Borrower:           REPOA

Implementing Agency:  REPOA

 

Projects Financed by World Bank in Tanzania – Kikwete Presidency (1964 – 5th November 1985)

Jakaya Kikwete Biography - Early Life, Career, Legacy and MoreThe World Bank funded a total of 71 projects during the Kikwete presidency, which amounted to US $ 5,671,940,000.00 between 2005-2015.

The full list of projects is as follows:

Project Name: Tanzania PRSC-4

Project Status: Closed
Details:
Approval Date: 2006-05-09T00: 00: 00Z
Closing Date: 2007-06-30T00: 00: 00Z
Total Project Fund: USD 200,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Institution(s): MINISTRY OF FINANCE

Project Name: Program of Accountability: Programs for Transparency and Integrity

Project Status: Closed
Details:
Approval Date: 2006-05-09T00: 00: 00Z
Closing Date: 2012-03-30T00: 00: 00Z
Total Project Fund: USD 40,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: OFFICE OF THE SECRETARY GENERAL / CHIEF OF PUBLIC SERVICE

Project Name: Financial Sector Support Project

Project Status: Closed
Details:
Approval Date: 2006-06-15T00: 00: 00Z
Closing Date: 2013-06-30T00: 00: 00Z
Total Project Fund: US $ 15,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: CENTRAL BANK OF TANZANIA

Project Name: Local Government Support-Empowerment Project

Project Status: Closed
Details:
Approval Date: 2006-06-15T00: 00: 00Z
Closing Date:
Total Project Fund: US $ 98,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: OFFICE OF THE PRESIDENT REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (ORTAMISEM)

Project Name: Tanzania Agricultural Sector Development Project

Project Status: Closed
Details:
Approval Date: 2006-06-15T00: 00: 00Z
Closing Date: 2012-03-30T00: 00: 00Z
Total Project Fund: USD 90,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF AGRICULTURE AND FOOD

Project Name: Modern Tax Development Project

Project Status: Closed
Details:
Approval Date: 2006-06-15T00: 00: 00Z
Closing Date: 2011-09-30T00: 00: 00Z
Total Project Fund: US $ 12,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: TANZANIA REVENUE AUTHORITY

Project Name: Water Sector Support Project

Project Status: Closed
Details:
Approval Date: 2007-02-15T00: 00: 00Z
Closing Date: 2015-12-31T00: 00: 00Z
Total Project Fund: USD 200,000,000.00
Borrower: THE GOVERNMENT OF THE UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF WATER

Project Name: Fifth Poverty Reduction Grant in Tanzania

Project Status: Closed
Details:
Approval Date: 2007-04-24T00: 00: 00Z
Closing Date: 2008-06-30T00: 00: 00Z
Total Project Fund: $ 190,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF FINANCE

Project Name: Zanzibar Early Childhood Education Development Improvement Project

Project Status: Closed
Details:
Approval Date: 2007-04-24T00: 00: 00Z
Closing Date: 2013-11-30T00: 00: 00Z
Total Project Fund: USD 42, 000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF EDUCATION AND VOCATIONAL TRAINING ZANZIBAR

Project Name: Tanzania Health Sector Development II Addition

Project Status: Closed
Details:
Approval Date: 2007-07-05T00: 00: 00Z
Closing Date:
Total Project Fund: US $ 60,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF HEALTH AND SOCIAL WELFARE (WAUJ) AND OFFICE OF THE PRIME MINISTER REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PMO-RALG)

Project Name: Accountability Project and Performance Outcomes

Project Status: Closed
Details:
Approval Date: 2007-09-27T00: 00: 00Z
Closing Date: 2012-12-31T00: 00: 00Z
Total Project Fund: USD 40,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: OFFICE OF THE PRESIDENT PUBLIC SERVICE MANAGEMENT

Project Name: Lower Kihansi Environmental Management Project II

Project Status: Closed
Details:
Approval Date: 2007-09-24T00: 00: 00Z
Closing Date: 2013-11-30T00: 00: 00Z
Total Project Fund: USD 3,500,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency:

Project Name: Energy Development Project and Access Expansion TZ

Project Status: Closed
Details:
Approval Date: 2007-12-13T00: 00: 00Z
Closing Date: 2012-09-29T00: 00: 00Z
Total Project Fund: $ 105,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: TANESCO; MINISTRY OF ENERGY AND MINERALS

Project Name: TZ Access Expansion and GEF Energy Development

Project Status: Closed
Details:
Approval Date: 2007-12-13T00: 00: 00Z
Closing Date: 2015-03-31T00: 00: 00Z
Total Project Fund: –
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF ENERGY AND MINERALS

Project Name: Higher Education Science and Technology

Project Status: Closed
Details:
Approval Date: 2008-05-27T00: 00: 00Z
Closing Date: 2016-01-31T00: 00: 00Z
Total Project Fund: US $ 100,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: OFFICE OF THE PRIME MINISTER; MINISTRY OF SCIENCE

Project Name: The Second Central Transport Corridor Project

Project Status: Closed
Details:
Approval Date: 2008-05-27T00: 00: 00Z
Closing Date: 2016-12-31T00: 00: 00Z
Total Project Fund: $ 190,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: NATIONAL ROADS AGENCY TANZANIA (TANROADS)

Project Name: Sixth Poverty Reduction Grant (PRSC6)

Project Status: Closed
Details:
Approval Date: 2008-10-21T00: 00: 00Z
Closing Date: 2009-11-30T00: 00: 00Z
Total Project Fund: USD 160,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF FINANCE

Project Name: The East African Family Pedal Power and Lighting Project

Project Status: Closed
Details:
Approval Date: 2008-12-30T00: 00: 00Z
Closing Date: 2010-04-29T00: 00: 00Z
Total Project Funds: US Dollars-
Borrower: DISSINGO
Responsible Agency: DISSINGO

 

Project Name: Rendering Reliable and Affordable Solar Energy System in Northern Tanzania

Project Status: Closed
Details:
Approval Date: 2008-12-30T00: 00: 00Z
Closing Date: 2010-07-15T00: 00: 00Z
Total Project Fund: US Dollars-
Borrower: ZARA SOLAR ENERGY COMPANY (ZARA SOLAR LTD)
Responsible Agency: ZARA SOLAR ENERGY COMPANY (ZARA SOLAR LTD)

Project Name: Tanzania Seventh Poverty Reduction Grant (PRSC7)

Project Status: Closed
Details:
Approval Date: 2009-06-09T00: 00: 00Z
Closing Date: 2010-11-30T00: 00: 00Z
Total Project Fund: $ 190,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF FINANCE

Project Name: Tanzania Accelerated Food Security Multiplication Project

Project Status: Closed
Details:
Approval Date: 2009-06-09T00: 00: 00Z
Closing Date: 2014-06-30T00: 00: 00Z
Total Project Fund: USD 160,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF AGRICULTURE, FOOD SECURITY AND COOPERATIVES

Project Name: Fundraising Project for Agricultural Sector Development

Project Status: Closed
Details:
Approval Date: 2009-06-09T00: 00: 00Z
Closing Date:
Total Project Fund: US $ 30,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF AGRICULTURE FOOD SAFETY AND COOPERATIVE PARTIES

Project Name: Fundraising for the Development of the Tanzania Second Social Action Fund (TASAF II)

Project Status: Closed
Details:
Approval Date: 2009-06-00T00: 00: 00Z
Closing Date:
Total Project Fund: US $ 30,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: TANZANIA SOCIAL DEVELOPMENT FUND (TASAF)

Project Name: Sustainable Mineral Resources Management

Project Status: Closed
Details:
Approval Date: 2009-06-09T00: 00: 00Z
Closing Date: 2018-12-31T00: 00: 00Z
Total Project Fund: USD 50,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: WORLD BANK

Project Name: Seventh Poverty Alleviation Support Credit – Supplemental Financing

Project Status: Closed
Details:
Approval Date: 2009-12-22T00: 00: 00Z
Closing Date:
Total Project Fund: $ 170,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF FINANCE

 

Project Name: The 2nd Tanzania Health Sector Development Project – Additional Financing FY10

Project Status: Closed
Details:
Approval Date: 2009-12-22T00: 00: 00Z
Closing Date:
Total Project Fund: USD 40,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF HEALTH AND OFFICE OF THE PRIME MINISTER REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PMO-RALG)

Project Name: Tanzania Housing Finance Project

Project Status: Closed
Details:
Approval Date: 2010-03-09T00: 00: 00Z
Closing Date: 2019-06-28T00: 00: 00Z
Total Project Fund: USD 40,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: MINISTRY OF FINANCE

Project Name: Additional Fundraising – Energy Development and Access Expansion Project

Project Status: Closed
Details:
Approval Date: 2010-04-06T00: 00: 00Z
Closing Date: 2014-10-31T00: 00: 00Z
Total Project Fund: US $ 25,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF ENERGY AND MINERALS

Project Name: BEIA-Promoting Manufactured Charcoal in Tanzania

Project Status: Closed
Details:
Approval Date: 2010-04-06T00: 00: 00Z
Closing Date: 2012-09-30T00: 00: 00Z
Total Project Fund: US Dollars –
Borrower: RELEVANT INSTITUTE OF RURAL TECHNOLOGY
Responsible Agency: RELEASED INSTITUTE OF RURAL TECHNOLOGY TANZANIA (ARTITZ)

Project Name: Tanzania Strategic Cities Project

Project status: Active
Details:
Approval Date: 2010-05-27T00: 00: 00Z
Closing Date: 2010-11-26T00: 00: 00Z
Total Project Fund: USD 163,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: OFFICE OF THE PRIME MINISTER REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PMO-RALG)

Project Name: Secondary Education Development Program II

Project status: Closed
Details:
Approval Date: 2010-05-27T00: 00: 00Z
Closing Date: 2016-12-31T00: 00: 00Z
Total Project Fund: USD 150,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF EDUCATION

 

Project Name: Second Additional Funding for the Agricultural Sector Development Project

Project status: Closed
Details:
Approval Date: 2010-05-28T00: 00: 00Z
Closing Date:
Total Project Fund: USD 35,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF AGRICULTURE FOOD SAFETY AND COOPERATIVES

Project Name: SECOND ADDITIONAL FINANCING FOR TASAF II

Project status: Closed
Details:
Approval Date: 2010-06-04T00: 00: 00Z
Closing Date:
Total Project Fund: USD 35,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: TANZANIA SOCIAL ACTION FUND

Project Name: Tanzania – Backbone Transmission Investment Project

Project status: Closed
Details:
Approval Date: 2010-08-26T00: 00: 00Z
Closing Date: 2016-12-31T00: 00: 00Z
Total Project Fund: $ 150,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: TANESCO 

Project Name: Tanzania ICT and Services Incubator (AFR 5)

Project status: Closed
Details:
Approval Date: 2010-09-03T00: 00: 00Z
Closing Date: 2013-06-30T00: 00: 00Z
Total Project Fund: US Dollars –
Borrower: TO BE DETERMINED
Responsible Agency: TO BE DETERMINED

Project Name: Tanzania Poverty Alleviation Support Credit 8

Project status: Closed
Details:
Approval Date: 2010-09-28T00: 00: 00Z
Closing Date: 2012-08-31T00: 00: 00Z
Total Project Fund: US $ 115,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF FINANCE

Project Name: Extending Mobile Applications in Africa – Tanzania (COSTECH)

Project status: Closed
Details:
Approval Date: 2010-11-17T00: 00: 00Z
Closing Date: 2013-02-22T00: 00: 00Z
Total Project Fund: US Dollar –
Borrower: TANZANIA SCIENCE AND TECHNOLOGY COMMISSION
Responsible Agency: COMMISSION OF SCIENCE AND TECHNOLOGY TANZANIA

 

Project Name: Tanzania Rural Food Enhancement Project

Project status: Closed
Details:
Approval Date: 2011-02-22T00: 00: 00Z
Closing Date: 2015-12-27T00: 00: 00Z
Total Project Fund: US Dollar –
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: TANZANIA NUTRITION AND FOOD CENTER

Project Name: Zanzibar Urban Service Project

Project status: Active
Details:
Approval Date: 2011-02-24T00: 00: 00Z
Closing Date: 2020-12-31T00: 00: 00Z
Total Project Fund: US $ 38,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: OFFICE OF THE DEPUTY PRESIDENT; ZANZIBAR REVOLUTIONARY GOVERNMENT

Project Name: Construction of the National Statistical System in Tanzania

Project status: Closed
Details:
Approval Date: 2011-03-24T00: 00: 00Z
Closing Date: 2018-06-30T00: 00: 00Z
Total Project Fund: USD 30,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: NATIONAL STATISTICS OFFICE

Project Name: Additional funding for the Tanzania Energy Development and Access Expansion Project

Project status: Closed
Details:
Approval Date: 2011-06-07T00: 00: 00Z
Closing Date:
Total Project Fund: USD 27,880,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: TANESCO

Project Name: Fundraising for the Tanzania Transport Sector Support Project

Project status: Closed
Details:
Approval Date: 2011-06-30T00: 00: 00Z
Closing Date:
Total Project Fund: US $ 59,000,000.00
Borrower: MINISTRY OF FINANCE
Responsible Agency: MINISTRY OF INFRASTRUCTURE AND COMMUNICATIONS (MOIC)

Project Name: Fundraising PHRD-Tanzania Agricultural Sector Development Project

Project status: Closed
Details:
Approval Date: 2012-12-19T00: 00: 00Z
Closing Date:
Total Project Fund: US Dollar –
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF KILOMO, FOOD AND COOPERATIVES

Project Name: Tanzania Primary Health Care Project

Project status: Closed
Details:
Approval Date: 2011-12-20T00: 00: 00Z
Closing Date: 2016-10-30T00: 00: 00Z
Total Project Fund: $ 100,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: MINISTRY OF HEALTH AND SOCIAL DEVELOPMENT

 

Project Name: Tanzania Poverty Alleviation Credit 9

Project status: Closed
Details:
Approval Date: 2012-03-15T00: 00: 00Z
Closing Date: 2013-06-30T00: 00: 00Z
Total Project Fund: $ 100,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF FINANCE

 

Project Name: Tanzania Productive Social Safety Net

Project status: Closed
Details:
Approval Date: 2010-03-29T00: 00: 00Z
Closing Date: 2019-12-31T00: 00: 00Z
Total Project Fund: USD 220,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: TANZANIA SOCIAL DEVELOPMENT FUND

Project Name: EITI Implementation: Phase Two in Tanzania

Project status: Closed
Details:
Approval Date: 2012-05-30T00: 00: 00Z
Closing Date: 2014-06-30T00: 00: 00Z
Total Project Funds: US Dollar –
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: SECRETARIAT OF EIITI / MINISTRY OF ENERGY AND MINERALS

Project Name: Urban Local Government Strengthening Program

Project status: Closed
Details:
Approval Date: 2012-10-23T00: 00: 00Z
Closing Date: 2020-10-31T00: 00: 00Z
Total Project Fund: USD 255,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: PM’S OFFICE REGIONAL ADMIN & LOCAL GOVT (PMORALG)

 

Project Name: Third Additional Funding for the Agricultural Sector Development Project

Project status: Closed
Details:
Approval Date: 2012-10-23T00: 00: 00Z
Closing Date:
Total Project Fund: USD 30,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF AGRICULTURE FOOD SECURITY AND COOPERATIVE

Project Name: Accelerated Food Security Project Additional Financing

Project status: Closed
Details:
Approval Date: 2012-10-23T00: 00: 00Z
Closing Date:
Total Project Fund: US $ 25,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF AGRICULTURE FOOD SAFETY AND COOPERATIVES

Project Name: ADDITIONAL FUNDING FOR TANZANIA SECOND CENTRAL TRANSP CORRIDOR PROJECT

Project status: Closed
Details:
Approval Date: 2013-01-15T00: 00: 00Z
Closing Date:
Total Project Fund: $ 100,000,000.00
Borrower: MINISTRY OF FINANCE AND ECONOMIC AFFAIRS
Responsible Agency: NATIONAL ROADS AGENCY IN TANZANIA

Project Name: TANZANIA POVERTY REDUCTION SUPPORT GRANT 10

Project status: Closed
Details:
Approval Date: 2013-03-26T00: 00: 00Z
Closing Date: 2014-06-30T00: 00: 00Z
Total Project Fund: USD 75,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF FINANCE

 

Project Name: FIRST ENERGY AND GAS SECTOR TZ DPO

Project status: Closed
Details:
Approval Date: 2013-03-26T00: 00: 00Z
Closing Date: 2014-06-30T00: 00: 00Z
Total Project Fund: $ 100,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF FINANCE

Project Name: Energy Sector Capacity Building Project (ESCBP)

Project status: Closed
Details:
Approval Date: 2013-03-26T00: 00: 00Z
Closing Date: 2018-12-31T00: 00: 00Z
Total Project Fund: USD 21,460,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF ENERGY AND MINERALS; TANZANIA ELECTRICITY Corporation (TANESCO); TANZANIA Petroleum (TIPER) Development Corporation (TPDC); ENERGY AND WATER SERVICES CONTROL AUTHORITY (EWURA)

Project Name: Kihansi Catchment Conservation and Management Project

Project status: Closed
Details:
Approval Date: 2013-09-26T00: 00: 00Z
Closing Date: 2019-12-31T00: 00: 00Z
Total Project Fund: US Dollar –
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: MINISTRIES OF THE GOVERNMENT OF TANZANIA

Project Name: Private Sector Competitiveness Project Additional Financing

Project status: Closed
Details:
Approval Date: 2013-12-27T00: 00: 00Z
Closing Date:
Total Project Fund: US $ 60,200,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: OFFICE OF THE PRIME MINISTER

Project Name: Tanzania’s Second Energy and Gas Sector DPO

Project status: Closed
Details:
Approval Date: 2014-03-21T00: 00: 00Z
Closing Date: 2015-06-30T00: 00: 00Z
Total Project Fund: $ 100,000,000.00
Borrower: MINISTRY OF FINANCE
Responsible Agency: MINISTRY OF FINANCE

Project Name: Tanzania Poverty Alleviation Assistance Loan 11

Project status: Closed
Details:
Approval Date: 2014-03-27T00: 00: 00Z
Closing Date: 2015-06-30T00: 00: 00Z
Total Project Fund: USD 85,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF FINANCE

 

Project Name: Tanzania – Intermodal & Rail Development Project

Project status: Closed
Details:
Approval Date: 2014-04-24T00: 00: 00Z
Closing Date: 2021-05-31T00: 00: 00Z
Total Project Fund: US $ 300,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: RELI ASSETS HOLDING COMPANY (RAHCO)

Project Name: Tanzania Renewable Energy Program

Project status: Closed
Details:
Approval Date: 2014-04-25T00: 00: 00Z
Closing Date: 2023-12-31T00: 00: 00Z
Total Project Fund: US Dollar –
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: RURAL ENERGY AGENCY

Project Name: Tanzania Strategic Cities Project AF

Project status: Active
Details:
Approval Date: 2014-05-29T00: 00: 00Z
Closing Date:
Total Project Fund: US $ 50,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: OFFICE OF THE PRIME MINISTER REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT (PMO-RALG)

Project Name: Tanzania Water Sector Support Project – Additional Financing

Project status: Closed
Details:
Approval Date: 2014-06-16T00: 00: 00Z
Closing Date:
Total Project Fund: USD 44,900,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF WATER AND PMO-RALG

Project Name: TZ Education Program for Results (EPforR)

Project status: Active
Details:
Approval Date: 2014-07-10T00: 00: 00Z
Closing Date: 2021-01-31T00: 00: 00Z
Total Project Fund: USD 122,000,000.00
Borrower: THE GOVERNMENT OF THE REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF EDUCATION

Project Name: Fundraising for Higher Education Science and Technology in Tanzania

Project status: Closed
Details:
Approval Date: 2014-07-10T00: 00: 00Z
Closing Date:
Total Project Fund: USD 15,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Responsible Agency: MINISTRY OF EDUCATION AND VOCATIONAL TRAINING IN TANZANIA

 

Project Name: Housing Finance Project

Project status: Active
Details:
Approval Date: 2015-02-24T00: 00: 00Z
Closing Date:
Total Project Funds: USD 60,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA; MOF
Responsible Agency: CENTRAL BANK OF TANZANIA

Project Name: Dar es Salaam City Project

Project status: Active
Details:
Approval Date: 2015-03-02T00: 00: 00Z
Closing Date: 2022-06-30T00: 00: 00Z
Total Project Fund: US $ 300,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: LOCAL AUTHORITIES DAR ES SALAAM

Project Name: Tanzania: Expanding Rice Production

Project status: Active
Details:
Approval Date: 2015-03-12T00: 00: 00Z
Closing Date: 2021-01-31T00: 00: 00Z
Total Project Funds: US Dollars –
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF AGRICULTURE

Project Name: Sustainable Mineral Resources Management in Tanzania

Project status: Active
Details:
Approval Date: 2015-05-07T00: 00: 00Z
Closing Date:
Total Project Fund: USD 45,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF ENERGY AND MINERALS

Project Name: Strengthening Primary Health Care for Results

Project status: Active
Details:
Approval Date: 2015-05-28T00: 00: 00Z
Closing Date: 2021-06-30T00: 00: 00Z
Total Project Fund: USD 200,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Responsible Agency: MINISTRY OF HEALTH AND PMO-RALG

Project Name: Open Government and Public Financial Management

Project status: Closed
Details:
Approval Date: 2015-06-23T00: 00: 00Z
Closing Date: 2015-12-31T00: 00: 00Z
Total Project Fund: US $ 100,000,000.00
Borrower: TANZANIA
Responsible Agency: TANZANIA

Project Name: Tanzania Business Environment and Competitiveness for Jobs DPO

Project status: Closed
Details:
Approval Date: 2015-09-03T00: 00: 00Z
Closing Date: 2016-08-31T00: 00: 00Z
Total Project Fund: USD 80,000,000.00
Borrower: MINISTRY OF FINANCE
Responsible Agency: MINISTRY OF FINANCE

 

Projects Financed by World Bank in Tanzania – Magufuli Presidency (1964 – 5th November 1985)

President John Magufuli
President John Magufuli

The World Bank has funded a total of 24 projects during Magufuli’s presidency, totaling $ 3,400,000,000.00 between 2015 – to date.

Here is a complete list of such projects:

Project Name: Southern Agricultural Growth Corridor of Tanzania Investment Project

Project Status: Closed
Details:
Permission Date: 2016-03-10T00: 00: 00Z
Closing Date: 2019-01-31T00: 00: 00Z
Total Project Amount: $ 70,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Implementing Agency: MINISTRY OF FINANCE

Project Name: Tanzania Mainland Household Budget Survey

Project Status: Closed
Details:
Permission Date: 2016-03-17T00: 00: 00Z
Closing Date: 2018-04-04T00: 00: 00Z
Total Project Amount: $ –
Borrower:
Implementing agency:

 

Project Name: Citizen-Centric Judicial Modernization and Justice Service Delivery

Project Status: Active
Details:
Permission date: 2016-04-06T00: 00: 00Z
Closing Date: 2021-06-30T00: 00: 00Z
Total Project volume: $ 65,000,000.00
Borrower:
Implementing Agency:

Project Name: TZ-Zanzibar Improving Student Prospects Project

Project Status: Active
Details:
Permission Date: 2016-06-13T00: 00: 00Z
Closing Date: 2021-07-31T00: 00: 00Z
Total Project Amount: $ 35,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA; MINISTRY OF
Implementing Agency: MINISTRY OF EDUCATION AND VOCATIONAL TRAINING

Project Name: Zanzibar Urban Services Project Additional Financing

Project Status: Active
Details:
Permission Date: 2016-06-13T00: 00: 00Z
Closing Date:
Total Project Amount: $ 55,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Implementing Agency: OFFICE OF THE PRESIDENT; MONEY; ECONOMY AND DEVELOPMENT PLANS

Project Name: Tanzania Education and Skills for Productive Jobs Program (ESPJ)

Project Status: Active
Details:
Permission Date: 2016-06-16T00: 00: 00Z
Closing Date: 2021-06-30T00: 00: 00Z
Total Project volume: $ 120,000,000.00
Borrower: MINISTRY OF FINANCE AND ECONOMIC AFFAIRS
Implementing Agency: MINISTRY OF EDUCATION AND VOCATIONAL TRAINING

Project Name: TZ-PSSN Additional Financing

Project Status: Active
Details:
Permission Date: 2016-06-16T00: 00: 00Z
Closing Date:
Total Project amount: $ 200,000,000.00
Borrower:
Implementing Agency:

Project Name: TZ-Rural Electrification Expansion Program

Project Status: Active
Details:
Permission Date: 2016-06-21T00: 00: 00Z
Closing Date: 2022-07-31T00: 00: 00Z
Total Project Amount: $ 200,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Implementation Agency: RURAL ELECTRICAL AGENCY AGENCY

 

Project Name: Second Tanzania Water Sector Support Project

Project Status: Active
Details:
Permission Date: 2017-01-23T00: 00: 00Z
Closing Date: 2022-06-30T00: 00: 00Z
Total Project Amount: $ 225,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Implementing Agency: MINISTRY; LGAS; WATER BOARDS; WATER SERVICES

Project Name: TSCP Second Additional Financing

Project Status: Active
Details:
Permission Date: 2017-02-27T00: 00: 00Z
Closing Date:
Total Project Amount: $ 130,000,000.00
Borrower: MINISTRY OF FINANCE
Executive Agency: OFFICE OF THE PRESIDENT REGIONAL ADMINISTRATION AND LOCAL GOVERNMENT

Project Name: Dar es Salaam Urban Transport Improvement Project

Project Status: Active
Details:
Permission Date: 2017-03-08T00: 00: 00Z
Closing Date: 2023-12-31T00: 00: 00Z
Total Project Amount: $ 425,000,000.00
Borrower: REPUBLIC OF TANZANIA
Implementing Agency: TANROADS

Project Name: Mainland and Zanzibar National Audit Offices Capacity Building Project

Project Status: Closed

Details:
Permission Date: 2017-03-15T00: 00: 00Z
Closing Date: 2019-08-30T00: 00: 00Z
Total Project Amount: $ –
Borrower:
Implementing Agency:

Project Name: Education Program for Results Additional Financing (EPforR AF)

Project Status: Active

Details:
Permission Date: 2017-05-23T00: 00: 00Z
Closing Date:
Total Project Amount: $ 80,000,000.00
Borrower: UNITED REPUBLIC OF TANZANIA
Implementing Agency:

Project Name: Dar es Salaam Maritime Gateway Project
Project Name: Marine Water Gateway Project, Dar es Salaam

Project Status: Active
Details:
Permission Date: 2017-06-30T00: 00: 00Z
Closing Date: 2024-06-30T00: 00: 00Z
Total Project Amount: $ 345,000,000.00
Borrower: MINISTRY OF FINANCE
Implementing Agency: TANZANIA PORT AUTHORITY

 

Project Name: Accelerating Solar Water Pumping via Innovative Financing

Project Status: Active
Details:
Permission Date: 2017-09-07T00: 00: 00Z
Closing Date: 2020-12-30T00: 00: 00Z
Total Project Amount: $ –
Borrower:
Implementing Agency:

Project Name: Tanzania: Resilient Natural Resource Management for Tourism and Growth

Project Status: Active
Details:
Permission Date: 2017-09-28T00: 00: 00Z
Closing Date: 2023-09-28T00: 00: 00Z
Total Project Amount: $ 150,000,000.00
Borrower: THE GOVERNMENT OF TANZANIA
Implementing Agency: GOVERNMENT OF TANZANIA, VARIOUS WATER RESOURCES TEAM

Project Name: Sustainable Rural Water Supply and Sanitation Program

Project Status: Active
Details:
Permission Date: 2018-06-26T00: 00: 00Z
Closing Date: 2024-07-31T00: 00: 00Z
Total Project Amount: $ 350,000,000.00
Borrower: THE UNITED REPUBLIC OF TANZANIA
Implementing Agency: MINISTRY OF WATER AND IRRIGATION

Project Name: Development Support for Tanzania Statistics

Project Status: Active
Details:
Permission Date: 2018-08-14T00: 00: 00Z
Closing Date: 2021-01-31T00: 00: 00Z
Total Project Amount: $ –
Borrower:
Implementing Agency:

Project Name: Tanzania Productive Social Safety Net Project II

Project Status: Active
Details:
Permission Date: 2019-09-12T00: 00: 00Z
Closing Date: 2023-09-30T00: 00: 00Z
Total Project Amount: $ 450,000,000.00
Borrower:
Implementing Agency:

Project Name: Tanzania Secondary Education Quality Improvement Project (SEQUIP)

Project Status: Active
Details:
Permission Date: 2020-03-31T00: 00: 00Z
Closing Date: 2026-01-31T00: 00: 00Z
Total Amount: $ 500,000,000.00
Borrower:
Implementing Agency:

 

Project Name: Extractive Industries Accountability and Governance Enhancement Project

Project Status: Active
Details:
Permission Date: 2020-04-14T00: 00: 00Z
Closing Date:
Total Project Amount: $ –
Borrower:
Implementing Agency:

Project Name: COVID-19 Pandemic Emergency Financing Facility Project

Project Status: Active
Details:
Permission Date: 2020-09-01T00: 00: 00Z
Closing Date:
Total Project Amount: $ –
Borrower:
Implementing Agency:

Project Name: Livestock Project (03)

Project Status: Closed
Details:
Permission Date:
Closing Date:
Total Project Amount: $ –
Borrower:
Implementing Agency:

 

Project Name: Tanzania: Extractive Industries Transparency Initiative

Project Status: Closed
Details:
Permission Date:
Closing Date: 2012-03-31T00: 00: 00Z
Total Project Amount: $ –
Borrower: TANZANIA
Implementing Agency: EITI SECRETARIAT / MINISTRY OF ENERGY AND MINERALS